Skip to main content

Toads take the high road

In Scotland's capital Edinburgh baby frogs and toads have had to be cleared from a road running though a public park. Recent weather conditions have been damp yet mild and have been ideal for the amphibians to spawn, with the result that the road around Arthur's Seat has had to be closed to traffic. Park rangers have been busy removing between 400-450 of the tiny baby frogs and toads at a time and moving the amphibians to a safe location.
July 30, 2012 Read time: 1 min
In Scotland's capital Edinburgh baby frogs and toads have had to be cleared from a road running though a public park. Recent weather conditions have been damp yet mild and have been ideal for the amphibians to spawn, with the result that the road around Arthur's Seat has had to be closed to traffic. Park rangers have been busy removing between 400-450 of the tiny baby frogs and toads at a time and moving the amphibians to a safe location.

Related Content

  • VIDEO: Yeti ploughs ahead
    November 15, 2019
    Yeti Snow Technology, a developer of autonomous snow clearance systems for airports, will scale back pilot projects this winter and focus on software development.
  • Skidmarks: Scaring speeders
    February 6, 2020
    Our Skidmarks page is highly rated by readers. Your input could help make this page even more entertaining. If you come across any amusing road-related stories or pictures email me at [email protected]
  • Tyne tunnel's water quality checks
    February 6, 2012
    Five buoy-mounted automatic water quality monitors (AWQMs) have been installed by YSI Hydrodata engineers at the new Tyne Tunnel project in north-east England. The equipment on the second vehicle tunnel under the River Tyne, currently one of the UK's largest construction projects, aims to ensure that construction operations do not significantly affect river water quality. Unusually, the contractors have not taken ownership of the instrumentation, preferring instead to simply purchase the data and alarms. Th
  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.