Skip to main content

Toads take the high road

In Scotland's capital Edinburgh baby frogs and toads have had to be cleared from a road running though a public park. Recent weather conditions have been damp yet mild and have been ideal for the amphibians to spawn, with the result that the road around Arthur's Seat has had to be closed to traffic. Park rangers have been busy removing between 400-450 of the tiny baby frogs and toads at a time and moving the amphibians to a safe location.
July 30, 2012 Read time: 1 min
In Scotland's capital Edinburgh baby frogs and toads have had to be cleared from a road running though a public park. Recent weather conditions have been damp yet mild and have been ideal for the amphibians to spawn, with the result that the road around Arthur's Seat has had to be closed to traffic. Park rangers have been busy removing between 400-450 of the tiny baby frogs and toads at a time and moving the amphibians to a safe location.

Related Content

  • Climate change affects the road network
    November 5, 2019
    Climate change is affecting the road network, with increased risks of flooding and wear and tear adding to maintenance headaches.
  • Austria's first PPP project takes shape
    July 31, 2012
    North of the Austrian capital Vienna, one of the region's biggest transport infrastructure projects for decades is currently under construction, the A5 Nordautobahn. This will give the Greater Vienna region its first-ever high-capacity link to the Czech motorway and arterial road network, greatly easing congestion on the old main road. In the first phase of construction, 22.7km of motorway are to be built. Work on the second section, all the way through to the Czech border, is to start in 2010. The A5 Norda
  • Historic Oakland Bay Bridge receives a new asphalt road surface
    March 31, 2014
    Part of an iconic US bridge has been given a new lease of life, as Mike Woof reports The western section of the historic Oakland Bay Bridge in the US state of California has recently benefited from a series of improvements to strengthen its structural integrity and also upgrade the running surface. Contractor OC Jones & Sons of Berkeley CA, paved large portions of the bridge, taking on two different projects as part of the work. First was placement of the specialised epoxy on the self-anchored suspension (S
  • Siemens extends traffic control in China
    February 24, 2012
    Two Siemens PC SCOOT systems have recently been installed in the Chinese cities of Nanjing and Wuhan, and more equipment has been supplied to Chengdu and Dalian.