Skip to main content

Tight spots for Grove long boom cranes

A single Tier 4 Final engine powers both of Manitowoc’s new Grove GMK5150L and GMK5250L all-terrain cranes. The company says that the concept was pioneered by Grove on its highly successful Grove GMK6400.
January 19, 2017 Read time: 3 mins
Manitowoc’s Grove GMK5150L and GMK5250L cranes: mounted and ready to go

A single Tier 4 Final engine powers both of 2123 Manitowoc’s new Grove GMK5150L and GMK5250L all-terrain cranes. The company says that the concept was pioneered by Grove on its highly successful Grove GMK6400.

The engine drives both the carrier and superstructure, reducing overall weight and lowering fuel consumption, which leads to lower operating and maintenance costs.

The “L” designation indicates long boom allowing the models more reach for a variety of applications, such as tower crane assembly, narrow lifts in congested cities or reaching over buildings to complete HVAC projects.

The GMK5250L has a 70m boom while the GMK5150L boasts a 60m boom.

Grove also offers the GMK5150 with a shorter, 51m boom and slightly increased load charts. Manitowoc says that the MEGAFORM shaping and Twin-Lock pinning ensure these hydraulic booms are among the most stable on the market.

The GMK5150L and GMK5250L also feature Manitowoc’s Crane Control System (CCS) that now features on every new all-terrain crane model, as well as crawler cranes, rough-terrain cranes and tower cranes. This makes it easier for fleets to operate and maintain a standardised set of crane controls across several crane types. Its Boom Configurator Mode makes it quick and easy for operators to select optimum boom positions for lifts.

Specifically, the five-axle Grove GMK5150L has a 150tonne capacity, making it the leader in its class. Its class-leading characteristics are retained both when configured with its maximum counterweight for maximum lifting capacity or for partial counterweight configurations. Due to the very low gross vehicle mass for a crane this size, more counterweight can be carried while still meeting the criteria for various road regulations in North America.

Maximum counterweight for the crane is 45tonne, which allows for an overall load chart increase of up to 20% over the previous generation GMK5165-2. With a capacity of 11.8tonnes with its boom fully extended, Manitowoc says the GMK5150L is ideal for tower crane assembly or where strength at height is needed.

The crane can carry up to 7.9tonnes of counterweight in the boom over front travel configuration—if roading regulations permit—enabling the crane to achieve a Gross Vehicle Weight of less than 12tonnes/axle. In addition, models in this range are equipped with attaching points that accommodate a boom dolly for areas that require travel in the trailing boom configuration.

Manitowoc says the 250tonne capacity GMK5250L was the first mobile crane to feature the VIAB turbo clutch module that eliminates fluid overheating and clutch burning while simultaneously delivering improved fuel economy. The VIAB module also enables class-leading maneuverability and driver comfort by working in tandem with the crane’s integrated retarder, resulting in wear-free braking and starting.

With its 12tonne/axle configuration, and dimensions suited to global roading requirements, the compact GMK5250L offers excellent roadability. Special attention has been given to the appropriate axle-group spacing, and specifically, the fact that this exceeds 2.4m—a strict requirement for roading mobile cranes in North America.

Other features on the GMK5250L include interchangeable counterweight slabs. These can also be shared among the GMK5180-1, GMK5200-1 and GMK6300L models. There is a self-rigging auxiliary hoist which is interchangeable with cranes in the GMK line from the GMK5180-1 up to GMK6300L.

For more information on companies in this article

Related Content

  • Hitachi Sumitomo’s European launch of new SCX1500A-3 hydraulic crawler crane
    January 6, 2017
    Hitachi Sumitomo Heavy Industries Construction Crane Company (HSC) says its new 150tonne capacity SCX1500A-3 hydraulic crane, being unveiled at bauma, has features to enhance its sustainability, mobility, performance and safety. Said to be suitable for construction, material handling and civil engineering applications, the SCX1500A-3 has been manufactured to comply with Stage IIIB emission regulations. Equipped with a powerful new-generation 210kW Isuzu engine, the sustainability of the 150tonne x4.5m lifti
  • Hitachi Sumitomo’s European launch of new SCX1500A-3 hydraulic crawler crane
    February 11, 2013
    Hitachi Sumitomo Heavy Industries Construction Crane Company (HSC) says its new 150tonne capacity SCX1500A-3 hydraulic crane, being unveiled at bauma, has features to enhance its sustainability, mobility, performance and safety. Said to be suitable for construction, material handling and civil engineering applications, the SCX1500A-3 has been manufactured to comply with Stage IIIB emission regulations. Equipped with a powerful new-generation 210kW Isuzu engine, the sustainability of the 150tonne x4.5m lifti
  • Heavy lifting
    January 7, 2019
    UAE-based crane service provider Al Faris dispatched a team to Hamriyah, to lift three 72m-long, 130tonne spud legs from a barge. The job needed a powerful and precise crane and a Demag CC 3800-1 proved to be a highly suitable machine for the project. The unit first had to be transported to the worksite. The company’s own lowbed trailers needed a good ten hours to complete the 82km journey from the Al Faris location in Dubai Industrial City to the worksite. Al Faris’ own all-terrain cranes were used in ord
  • Manitowoc’s Potain MR418 luffing jib crane comes to Europe
    March 15, 2016
    From Manitowoc’s top-slewing line, the company will introduce to Europe its Potain MR418 luffing jib crane. Both the MR418 and MDT389 are notable for their capacity and size, which allow contractors to make significant cost and time savings on projects. With a maximum capacity of 24tonnes, the MR418 is one of the largest luffing jib cranes from Potain. While the MDT 389, with a 16tonne maximum capacity, is the largest crane in the new CCS topless range. The MDT219 is the largest model in the new MDT C