Skip to main content

Tight spots for Grove long boom cranes

A single Tier 4 Final engine powers both of Manitowoc’s new Grove GMK5150L and GMK5250L all-terrain cranes. The company says that the concept was pioneered by Grove on its highly successful Grove GMK6400.
January 19, 2017 Read time: 3 mins
Manitowoc’s Grove GMK5150L and GMK5250L cranes: mounted and ready to go

A single Tier 4 Final engine powers both of 2123 Manitowoc’s new Grove GMK5150L and GMK5250L all-terrain cranes. The company says that the concept was pioneered by Grove on its highly successful Grove GMK6400.

The engine drives both the carrier and superstructure, reducing overall weight and lowering fuel consumption, which leads to lower operating and maintenance costs.

The “L” designation indicates long boom allowing the models more reach for a variety of applications, such as tower crane assembly, narrow lifts in congested cities or reaching over buildings to complete HVAC projects.

The GMK5250L has a 70m boom while the GMK5150L boasts a 60m boom.

Grove also offers the GMK5150 with a shorter, 51m boom and slightly increased load charts. Manitowoc says that the MEGAFORM shaping and Twin-Lock pinning ensure these hydraulic booms are among the most stable on the market.

The GMK5150L and GMK5250L also feature Manitowoc’s Crane Control System (CCS) that now features on every new all-terrain crane model, as well as crawler cranes, rough-terrain cranes and tower cranes. This makes it easier for fleets to operate and maintain a standardised set of crane controls across several crane types. Its Boom Configurator Mode makes it quick and easy for operators to select optimum boom positions for lifts.

Specifically, the five-axle Grove GMK5150L has a 150tonne capacity, making it the leader in its class. Its class-leading characteristics are retained both when configured with its maximum counterweight for maximum lifting capacity or for partial counterweight configurations. Due to the very low gross vehicle mass for a crane this size, more counterweight can be carried while still meeting the criteria for various road regulations in North America.

Maximum counterweight for the crane is 45tonne, which allows for an overall load chart increase of up to 20% over the previous generation GMK5165-2. With a capacity of 11.8tonnes with its boom fully extended, Manitowoc says the GMK5150L is ideal for tower crane assembly or where strength at height is needed.

The crane can carry up to 7.9tonnes of counterweight in the boom over front travel configuration—if roading regulations permit—enabling the crane to achieve a Gross Vehicle Weight of less than 12tonnes/axle. In addition, models in this range are equipped with attaching points that accommodate a boom dolly for areas that require travel in the trailing boom configuration.

Manitowoc says the 250tonne capacity GMK5250L was the first mobile crane to feature the VIAB turbo clutch module that eliminates fluid overheating and clutch burning while simultaneously delivering improved fuel economy. The VIAB module also enables class-leading maneuverability and driver comfort by working in tandem with the crane’s integrated retarder, resulting in wear-free braking and starting.

With its 12tonne/axle configuration, and dimensions suited to global roading requirements, the compact GMK5250L offers excellent roadability. Special attention has been given to the appropriate axle-group spacing, and specifically, the fact that this exceeds 2.4m—a strict requirement for roading mobile cranes in North America.

Other features on the GMK5250L include interchangeable counterweight slabs. These can also be shared among the GMK5180-1, GMK5200-1 and GMK6300L models. There is a self-rigging auxiliary hoist which is interchangeable with cranes in the GMK line from the GMK5180-1 up to GMK6300L.

For more information on companies in this article

Related Content

  • Emissions legislation driving machinery design
    June 13, 2012
    Legislative and economic factors are impacting upon the earthmoving equipment market - Mike Woof reports No-one who has any connection with the construction equipment sector can have failed to notice that increasingly tough emissions legislation has changed the shape of machines over the last 10 years or so. A series of targets have been set and met with regard to the exhaust emissions permitted from off-highway machines used in North America and Europe. The latest round of requirements has seen the intr
  • Soilmec’s compact piling rig works in tight spots
    February 2, 2015
    Italian drilling, piling and foundation equipment specialist Soilmec is introducing its compact SM-4 rig designed to create sectional flight auger (SFA) piles, a technique that uses sectional lengths of a hollow stem continuous flight auger. Soilmec says that the new machine is ideal for “job sites with low head room or very restricted (access),” and in situations that “a CFA rig cannot reach.” Once the SM-4 is on site, “each section, commencing with a toothed lead auger, is added to the rig as the auger
  • Soilmec’s compact piling rig works in tight spots
    January 6, 2017
    Italian drilling, piling and foundation equipment specialist Soilmec is introducing its compact SM-4 rig designed to create sectional flight auger (SFA) piles, a technique that uses sectional lengths of a hollow stem continuous flight auger. Soilmec says that the new machine is ideal for “job sites with low head room or very restricted (access),” and in situations that “a CFA rig cannot reach.” Once the SM-4 is on site, “each section, commencing with a toothed lead auger, is added to the rig as the auger
  • J FFrench connection with new LiuGong machines
    April 2, 2014
    London, England-based J. Ffrench Plant Hire has recently signed a deal for one of the largest orders for LiuGong construction equipment in the United Kingdom. The order will see the delivery of 20 LiuGong machines, which will be supplied by Construction Plant & Machinery Sales (CPMS), over the coming months. This large order also includes the supply of the UK’s first Dressta dozer, a TD15M Extra model. Talking about the deal, Grant McGregor, of CPMS, said, “After testing the reliability and productiv