Skip to main content

Test Product Story 2 Published on 13 December 2016

Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Te
December 13, 2016 Read time: 1 min
The base courses additionally had to be stabilized at the end of runway 20. In the first stage, the complete pavement – some 3,420 m³ of material – was reclaimed by a team of three Wirtgen machines: two W 210 machines and a W 200i.
Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 Test Product Story 2 Published on 13 December 2016 178 Caterpillar

For more information on companies in this article

Related Content

  • Precise planer control provides profitability and productivity
    January 31, 2013
    Productivity and profitability mean more than how many metres per minute your cold planer mills. In today’s world, precision is every bit as important as pace. Precision eliminates costly rework. It ensures crews don’t remove excess materials, and incur the associated costs in fuel, hauling and machine life. Precision also impacts the entire life—and cost—of a project by creating the proper foundation on which all subsequent work occurs. Cat® Grade and Slope for cold planers helps deliver that precision. Am
  • Hewden Core Fleet Guarantee success sparks huge investment
    February 20, 2014
    Hewden, the national UK plant hire specialist, is investing over €70 million in its machine lines after seeing an enthusiastic response to its Core Fleet Guarantee (CFG). The CFG, said to be the first in the hire industry, offers a next day delivery on the 30 most hired plant and access machines or the customer receives a credit of €119 (£100). Launched in February 2013, 20,363 deliveries had been made up until mid-November 2013, 20,115 being delivered on time, giving an on time success rate of 98.78%.
  • CNH Industrial forecasts growth for its Construction Equipment business in 2014
    January 31, 2014
    CNH Industrial is forecasting improved performance from its Construction Equipment business in 2014 after the overall Group recorded net revenues of €25.8 billion in 2013 – up 4.3% on a constant currency basis on 2012 revenues. Revenues from the Construction Equipment and Agricultural businesses, the former including the globally renowned Case and New Holland brands, were in line with 2012 at €16.006 billion. On a constant currency basis, revenues from Construction Equipment-Agricultural increased by €759
  • Cleaner roadworks
    February 14, 2012
    Roadtec is developed a new sweeping system for clearing road surfaces after road construction work has been carried out. The new FM-85 is a heavy-duty, front-mounted broom and is powered by a Caterpillar 3.4T diesel rated at 61kW. The machie weighs in at 2.7tonnes and feature an innovative side shift system that allows the brush to move 380mm. The novel telescoping feature allows brudhes measuing 1.83, 2.13 and 2.44m long to be fitted. The operator sits inside a high visibility cab with air-conditioning and