Skip to main content

Terex is offering large capacity lifting with its Superlift 3800 crawler crane

Terex’s powerful Superlift 3800 crawler crane is now being offered in a larger configuration than before. According to Terex, the new Superlift has been designed to boost performance in the 650tonne capacity class and replaces the firm’s well-proven CC 2800-1. Requiring up to 30% less counterweight for long boom erection, the crane features a new-style cab and Terex fall protection system. The Superlift has a maximum lift capacity of 650tonnes at 12m and a maximum hook height of 190m. Maximum load moment
January 20, 2014 Read time: 1 min
Terex Superlift 38000 crawler crane
1222 Terex’s powerful Superlift 3800 crawler crane is now being offered in a larger configuration than before. According to Terex, the new Superlift has been designed to boost performance in the 650tonne capacity class and replaces the firm’s well-proven CC 2800-1.

Requiring up to 30% less counterweight for long boom erection, the crane features a new-style cab and Terex fall protection system. The Superlift has a maximum lift capacity of 650tonnes at 12m and a maximum hook height of 190m. Maximum load moment is 8426mtonnes. All the crane’s components weigh less than 40tonnes and are below 3m in width and height to make it easier to transport between sites.








%$Linker: 2 Asset <?xml version="1.0" encoding="utf-16"?><dictionary /> 2 43934 0 oLinkExternal www.Terex.com Terex web false /EasySiteWeb/GatewayLink.aspx?alId=43934 false false%>

For more information on companies in this article

Related Content

  • Bridge building in miniature by Cimolai
    January 6, 2017
    Bespoke equipment supplier Cimolai Technology is exhibiting a model of the equipment it supplied for a Bulgarian bridge project. Construction of the bridge entailed lifting and positioning pre-cast sections weighing up to 260tonnes. Cimolai designed, built and supplied a bespoke cantilever lifting system to sit atop the centre pillar and simultaneously hoist the blocks from barges 42m below on the river Danube. The company said its European contracting customers are increasingly winning orders further afiel
  • Bridge building in miniature by Cimolai
    April 19, 2013
    Bespoke equipment supplier Cimolai Technology is exhibiting a model of the equipment it supplied for a Bulgarian bridge project. Construction of the bridge entailed lifting and positioning pre-cast sections weighing up to 260tonnes. Cimolai designed, built and supplied a bespoke cantilever lifting system to sit atop the centre pillar and simultaneously hoist the blocks from barges 42m below on the river Danube. The company said its European contracting customers are increasingly winning orders further afiel
  • Lintec’s CSM 2500 plant offers low transport costs and quick assembly and disassembly
    February 12, 2013
    Lintec’s new CSM 2500 asphalt mixing plant with parallel drum and conventional screening machine will be on show at bauma. The parallel drum on the plant can be used for hot and cold recycling. Capable of producing 160tonnes/hour, the fully containerised configuration of the CSM 2500 is said by its German manufacturer to ensure lower transport costs and quick and efficient assembly and disassembly. The plant has six screening decks, a 60tonne capacity hot stone bin, a 45tonne reclaimed filler silo, produces
  • CTE’s European lift off
    January 6, 2017
    Since signing an exclusive licensing agreement with Genie Industries in 1987, CTE has become one of the largest European groups in the field of lifting and movement of materials. Founded in 1981, the company now has a commercial presence covering all five world continents.