Skip to main content

Tekla models its BIM software

More and more design and construction of infrastructure, from buildings and power plants to highways are using building information modelling software. BIM is increasingly the must-have ability for a supply chain and Tekla Structures Construction Modeling software allows concrete contractors to be part of the 3D BIM model.
January 30, 2015 Read time: 2 mins
Tekla’s new package offers increased construction efficiency
More and more design and construction of infrastructure, from buildings and power plants to highways are using building information modelling software.

BIM is increasingly the must-have ability for a supply chain and 7981 Tekla Structures Construction Modeling software allows concrete contractors to be part of the 3D BIM model.

Construction Modelling will be part of the offering by Tekla, part of the Trimble group. The software serves the three phases of concrete construction – modelling, planning and pouring. The 3D model can be shared with other departments, other supply chain partners and the main contractor by way of Tekla BIM sight.

Construction Modelling uses a Gantt chart interfaced with MS PROJECT and PRIMAVERA. The model can also be used during design and site management and also generates fabrication and formwork.

Road and road bridge main contractors have used Tekla Construction software in many award winning projects, such as the 2,010m cable-stayed Cao Lanh Bridge in the Mekong River delta in Vietnam, to be completed in 2017. Tekla software will also be used in maintenance scheduling for the bridge, part of the Central Mekong Delta Connectivity project, after it opens in 2017.

The Connectivity Project comprises two high cable-stay bridges with a combined length of 5,000m, as well as 25km of connecting roads. The bridges will replace slow ferry services at the Cao Lanh crossing over the Tien River and a parallel crossing over the Hau River at Vam Cong.

In Finland, the Vantaanjoki River Bridge is a design-build project in Vantaa that was started in 2011 and finished in 2013. It was one of the country’s first projects that used BIM, as a requirement both for design and construction.

The bridge crossing the river Vantaa is a pre-tensioned concrete beam bridge with spans of 32m, 45 m and finally 32m, with a width of 13m to allow for two lanes and a pedestrian way. The bridge was founded on steel piles. The approach embankments of the bridge were founded on pile slabs. The underpass of Tikkurilantie and trough are formed of reinforced concrete circular frame structure that has effective span of 5.9m and total length of around 100m.

For more information on companies in this article

Related Content

  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl
  • Emergent markets key for formwork sector growth
    May 21, 2014
    Central and south-east Europe are hotbeds for new highway infrastructure projects utilising cutting-edge formwork solutions, while a number of leading formwork manufacturers are also looking at emergent markets for growth. Guy Woodford reports Travelling between Hungary’s capital Budapest and Southern Dalmatia now takes less time thanks to the Pan-European Corridor Vc – European route 73. Numerous tunnels and bridges are erected along the 397km stretch of the European route 73 through Bosnia owing to the
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b