Skip to main content

Tekla models its BIM software

More and more design and construction of infrastructure, from buildings and power plants to highways are using building information modelling software. BIM is increasingly the must-have ability for a supply chain and Tekla Structures Construction Modeling software allows concrete contractors to be part of the 3D BIM model.
January 6, 2017 Read time: 2 mins
Tekla’s new package offers increased construction efficiency
More and more design and construction of infrastructure, from buildings and power plants to highways are using building information modelling software.

BIM is increasingly the must-have ability for a supply chain and 7981 Tekla Structures Construction Modeling software allows concrete contractors to be part of the 3D BIM model.

Construction Modelling will be part of the offering by Tekla, part of the Trimble group. The software serves the three phases of concrete construction – modelling, planning and pouring. The 3D model can be shared with other departments, other supply chain partners and the main contractor by way of Tekla BIM sight.

Construction Modelling uses a Gantt chart interfaced with MS PROJECT and PRIMAVERA. The model can also be used during design and site management and also generates fabrication and formwork.

Road and road bridge main contractors have used Tekla Construction software in many award winning projects, such as the 2,010m cable-stayed Cao Lanh Bridge in the Mekong River delta in Vietnam, to be completed in 2017. Tekla software will also be used in maintenance scheduling for the bridge, part of the Central Mekong Delta Connectivity project, after it opens in 2017.

The Connectivity Project comprises two high cable-stay bridges with a combined length of 5,000m, as well as 25km of connecting roads. The bridges will replace slow ferry services at the Cao Lanh crossing over the Tien River and a parallel crossing over the Hau River at Vam Cong.

In Finland, the Vantaanjoki River Bridge is a design-build project in Vantaa that was started in 2011 and finished in 2013. It was one of the country’s first projects that used BIM, as a requirement both for design and construction.

The bridge crossing the river Vantaa is a pre-tensioned concrete beam bridge with spans of 32m, 45 m and finally 32m, with a width of 13m to allow for two lanes and a pedestrian way. The bridge was founded on steel piles. The approach embankments of the bridge were founded on pile slabs. The underpass of Tikkurilantie and trough are formed of reinforced concrete circular frame structure that has effective span of 5.9m and total length of around 100m.

For more information on companies in this article

Related Content

  • US$4.86 billion infrastructure works for Vietnam
    October 30, 2024
    Transport infrastructure works worth US$4.86 billion are planned for Vietnam.
  • Tunnels - an environmentally attractive option?
    February 21, 2012
    While tunnels are often more expensive than bridges, they can offer environmentally attractive options for transport schemes. Tunnels offer environmentally attractive options for a range of transport infrastructure schemes, but in many cases high construction costs may restrict their use.
  • The concrete option
    July 31, 2012
    Concrete highway construction techniques and technology continues to evolve. Mike Woof reports The recent increases in oil costs are having a knock-on effect for the road construction sector, as asphalt prices have increased noticeably and faster than those for concrete. This has spurred renewed discussion over which construction technique now offers the best long term solution for road building. The debate between those in favour of concrete and those preferring asphalt for highway construction has been on
  • Special formwork solution for tricky Orinoco project
    April 24, 2013
    Taking a road and rail link across one of the biggest rivers in South America, together with its swamps and flood plain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shape with the Venezuelan government investing in the showcase project at Caicara del Orinoco. The bridge will have an overall length of 11.125km on completion, which is scheduled for 2015. The main bridge is 2.28km long, and the roadway is 55m above