Skip to main content

Take a breather with Herrenknecht’s ventilation shaft boring machine

For fast underground construction of slot holes with small diameters within highway tunnels, Herrenknecht is highlighting its Boxhole Boring Machine. The BBM is for slot holes, or boreholes, such as ventilation shafts, either inclined or vertical, with diameters of up to 1.5m and lengths of up to 60m. The machines are designed for stable rock with compressive strengths of 180 Megapascal or more. Herrenknecht, based in Schwanau, southwest Germany, uses pipe jacking technology for its BBM. A drilling un
February 10, 2016 Read time: 2 mins
For fast underground construction of slot holes with small diameters within highway tunnels, 2592 Herrenknecht is highlighting its Boxhole Boring Machine.

The BBM is for slot holes, or boreholes, such as ventilation shafts, either inclined or vertical, with diameters of up to 1.5m and lengths of up to 60m. The machines are designed for stable rock with compressive strengths of 180 Megapascal or more.

Herrenknecht, based in Schwanau, southwest Germany, uses pipe jacking technology for its BBM. A drilling unit at the head of the pipe string is pressed forward from the launch point. Further jacking pipes are installed one after the other in the pipe string and pushed forward, thus lengthening the jacking route.

A cutterhead excavates the rock at the tunnel face, which then falls through the centre of the rig due to the force of gravity. Removed material exits through a muck chute running inside down the length of the jacking pipes. After each jacking stroke, the drilling process is stopped briefly to secure the pipe string and the drilling unit. Then the next jacking pipe can be installed at the bottom of the pip string in the jacking frame.
 
When the desired drilling length is reached, the drilling unit is retracted and jacking pipes are removed one by one until the complete pipe string is dismantled. The drilling unit is retracted back into the jacking frame and a crawler unit can easily move the unit to the next job.

All videos

For more information on companies in this article

Related Content

  • Innovative new drainage solutions will help keep roads free from water
    October 2, 2014
    An array of new technologies will help optimise road drainage and minimise flooding risks - Mike Woof reports In the UK the specialist contractor Lanes Group has carried out extensive inspection work of the drainage systems for the M6 toll route around the city of Birmingham. A powerful zoom camera has been used to carry out the inspection work for Midland Expressway, which operates and maintains the 43km-long motorway, running from Coleshill to Cannock.
  • MAT Mischanlagentechnik debuts BE-2550 technology in Switzerland
    April 12, 2018
    The Bauer subsidiary MAT Mischanlagentechnik, known for microtunneling technology, has entered the large-diameter tunnelling market with its BE-2550 separating plant in Switzerland. The double-track Eppenberg tunnel in the Swiss canton of Solothurn is about 2.6 km long and is one of the busiest railway routes in Switzerland. Since November 2016, a 2,400tonne tunnel boring machine measuring around 115m long and 12.75m in diameter has been drilling through the mountain. The machine has been operating in the
  • Managing urban motorway complexity in Sydney
    October 4, 2012
    Sydney’s Hills M2 motorway is being widened while still carrying traffic and meeting tough environmental criteria More than 100,000 vehicles and over 27,000 bus commuters use the Hills M2 motorway on a typical workday, making it one of Sydney’s busiest motorway corridors. Owned and managed by Hills Motorway Ltd (HML) and a key part of the city’s orbital motorway network, the road stretches over 21km, providing a seamless link between the Lane Cove Tunnel and Westlink M7. The Hills M2 Upgrade is one of many