Skip to main content

Take a breather with Herrenknecht’s ventilation shaft boring machine

For fast underground construction of slot holes with small diameters within highway tunnels, Herrenknecht is highlighting its Boxhole Boring Machine. The BBM is for slot holes, or boreholes, such as ventilation shafts, either inclined or vertical, with diameters of up to 1.5m and lengths of up to 60m. The machines are designed for stable rock with compressive strengths of 180 Megapascal or more. Herrenknecht, based in Schwanau, southwest Germany, uses pipe jacking technology for its BBM. A drilling un
February 10, 2016 Read time: 2 mins
For fast underground construction of slot holes with small diameters within highway tunnels, 2592 Herrenknecht is highlighting its Boxhole Boring Machine.

The BBM is for slot holes, or boreholes, such as ventilation shafts, either inclined or vertical, with diameters of up to 1.5m and lengths of up to 60m. The machines are designed for stable rock with compressive strengths of 180 Megapascal or more.

Herrenknecht, based in Schwanau, southwest Germany, uses pipe jacking technology for its BBM. A drilling unit at the head of the pipe string is pressed forward from the launch point. Further jacking pipes are installed one after the other in the pipe string and pushed forward, thus lengthening the jacking route.

A cutterhead excavates the rock at the tunnel face, which then falls through the centre of the rig due to the force of gravity. Removed material exits through a muck chute running inside down the length of the jacking pipes. After each jacking stroke, the drilling process is stopped briefly to secure the pipe string and the drilling unit. Then the next jacking pipe can be installed at the bottom of the pip string in the jacking frame.
 
When the desired drilling length is reached, the drilling unit is retracted and jacking pipes are removed one by one until the complete pipe string is dismantled. The drilling unit is retracted back into the jacking frame and a crawler unit can easily move the unit to the next job.

All videos

For more information on companies in this article

Related Content

  • Pumps vital for Stockholm tunnel
    July 20, 2012
    A major tunnel project in the Swedish capital Stockholm will mean that roads in a residential area will be safe from workmen repairing power cables. The tunnel will not be visible when completed, but its importance to the city's development is considerable. It means 10km of high voltage cable cutting through a residential area will be replaced with cables laid through the new tunnel, providing sufficient land for some 3,000 badly-needed new homes in an area divided down the middle by Lake Mälaren and the Ba
  • Innovative burner cooling for asphalt plant
    March 15, 2016
    Günter Papenburg has developed a cooling feature for asphalt plants that it says shortens the time normally needed for a plant’s coal dust-fuelled burners to reach operating temperatures. The cooling technology has been licenced from LOESCHE, a German producer of coal milling systems. GP managing director Carsten Weiss claimed that the firm’s burners consume more of the fuel than rival types, which only burn 90% of the coal dust. “We get an asphalt temperature of 170°C with low emissions and high efficiency
  • Australian bridge slides into position
    July 18, 2012
    A heavy rail crossing as part of Australia's EastLink motorway demanded great ingenuity and careful planning Most of the 88 bridges on the EastLink tolled motorway in, Melbourne, Australia were kept as simple and straightforward as possible. Contractor Thiess John Holland (TJH) developed its own precast yard 150km from the city, which provided many of the prefabricated materials required for the structures. This offered speed and economy while logistics and sequencing were vital for their erection. But the
  • Novel drilling system from Minnich
    March 17, 2016
    Minnich Manufacturing has expanded its product range with a series of new models that offer additional capabilities. One of these is a special application drill designed for pinning temporary concrete barriers that separate traffic from work zones. The drill is said to save time and cost by eliminating the need for multiple workers to drill holes by hand. The barrier-mounted drill is designed to ride along the top of the wall and can drill three holes simultaneously. The self-propelled machine runs off a