Skip to main content

Take a breather with Herrenknecht’s ventilation shaft boring machine

For fast underground construction of slot holes with small diameters within highway tunnels, Herrenknecht is highlighting its Boxhole Boring Machine. The BBM is for slot holes, or boreholes, such as ventilation shafts, either inclined or vertical, with diameters of up to 1.5m and lengths of up to 60m. The machines are designed for stable rock with compressive strengths of 180 Megapascal or more. Herrenknecht, based in Schwanau, southwest Germany, uses pipe jacking technology for its BBM. A drilling un
February 10, 2016 Read time: 2 mins
For fast underground construction of slot holes with small diameters within highway tunnels, 2592 Herrenknecht is highlighting its Boxhole Boring Machine.

The BBM is for slot holes, or boreholes, such as ventilation shafts, either inclined or vertical, with diameters of up to 1.5m and lengths of up to 60m. The machines are designed for stable rock with compressive strengths of 180 Megapascal or more.

Herrenknecht, based in Schwanau, southwest Germany, uses pipe jacking technology for its BBM. A drilling unit at the head of the pipe string is pressed forward from the launch point. Further jacking pipes are installed one after the other in the pipe string and pushed forward, thus lengthening the jacking route.

A cutterhead excavates the rock at the tunnel face, which then falls through the centre of the rig due to the force of gravity. Removed material exits through a muck chute running inside down the length of the jacking pipes. After each jacking stroke, the drilling process is stopped briefly to secure the pipe string and the drilling unit. Then the next jacking pipe can be installed at the bottom of the pip string in the jacking frame.
 
When the desired drilling length is reached, the drilling unit is retracted and jacking pipes are removed one by one until the complete pipe string is dismantled. The drilling unit is retracted back into the jacking frame and a crawler unit can easily move the unit to the next job.

All videos

For more information on companies in this article

Related Content

  • Amey chooses polystyrene blocks for Scottish tunnel infill
    June 25, 2018
    Amey recently completed an infill project to make safe a disused railway tunnel underneath the approach roads north of Scotland’s Forth Road Bridge. The 420m tunnel was part of the Dunfermline to North Queensferry railway line that provided a link to the ferry service until the opening of the Forth Bridge in 1890. The 4.3m-wide and 5.1m-high tunnel with vaulted roof and brick lining continued in use for freight until 1954. The tunnel runs underneath the A9000 and B981 on the northern approach to the Forth
  • Doka delivers cantilevering for super-slim piers at Lahntal Bridge
    October 21, 2016
    Doka’s formwork expertise is currently in demand during the construction of one of the busiest motorway viaducts in Germany. The 400m six-lane Lahntal Bridge in Limburg dates from the early 1960s. Every day about 100,000 vehicles cross the bridge that spans the valley of the River Lahn. But traffic loads have increased sharply, so a new bridge is being built sited just a few metres west of the old viaduct. The new Lahntal viaduct will measure a massive 43.5m in width, enabling eight lanes plus hard shoul
  • German minister oversees huge Herrenknecht TBM tunnel deal for Wuhan, China
    April 28, 2014
    German Minister of Economy and Energy, Sigmar Gabriel, attended the signing of a prized contract for the delivery of two Herrenknecht tunnel boring machines (TBM) for a large multi-functional tunnel in the Chinese city of Wuhan.
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo