Skip to main content

Take a breather with Herrenknecht’s ventilation shaft boring machine

For fast underground construction of slot holes with small diameters within highway tunnels, Herrenknecht is highlighting its Boxhole Boring Machine. The BBM is for slot holes, or boreholes, such as ventilation shafts, either inclined or vertical, with diameters of up to 1.5m and lengths of up to 60m. The machines are designed for stable rock with compressive strengths of 180 Megapascal or more. Herrenknecht, based in Schwanau, southwest Germany, uses pipe jacking technology for its BBM. A drilling un
February 10, 2016 Read time: 2 mins
For fast underground construction of slot holes with small diameters within highway tunnels, 2592 Herrenknecht is highlighting its Boxhole Boring Machine.

The BBM is for slot holes, or boreholes, such as ventilation shafts, either inclined or vertical, with diameters of up to 1.5m and lengths of up to 60m. The machines are designed for stable rock with compressive strengths of 180 Megapascal or more.

Herrenknecht, based in Schwanau, southwest Germany, uses pipe jacking technology for its BBM. A drilling unit at the head of the pipe string is pressed forward from the launch point. Further jacking pipes are installed one after the other in the pipe string and pushed forward, thus lengthening the jacking route.

A cutterhead excavates the rock at the tunnel face, which then falls through the centre of the rig due to the force of gravity. Removed material exits through a muck chute running inside down the length of the jacking pipes. After each jacking stroke, the drilling process is stopped briefly to secure the pipe string and the drilling unit. Then the next jacking pipe can be installed at the bottom of the pip string in the jacking frame.
 
When the desired drilling length is reached, the drilling unit is retracted and jacking pipes are removed one by one until the complete pipe string is dismantled. The drilling unit is retracted back into the jacking frame and a crawler unit can easily move the unit to the next job.

All videos

For more information on companies in this article

Related Content

  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Tunnel construction benefits from improved visibility
    November 14, 2012
    Major new tunnel construction projects will, on completion, help secure more reliable journey times for hundreds of thousands of people across the world. Meanwhile, as Guy Woodford reports, leading ITS solution companies have been providing vital equipment for major road tunnels The Martina Tunnel Boring Machine (TBM), a 4,500tonne Herrenknecht Earth Pressure Balance Shield said to have a world record diameter of 15.55m, has required just under a year to build the first of two tunnel tubes for the 2.5km lon
  • World's largest tunnel boring machine
    May 9, 2012
    Russian operator company NCC (Nevskaya Concession Company) has placed an order with German manufacturer Herrenknecht for the world's largest tunnel boring machine (TBM). The Mixshield TBM, for construction of the Orlovski Tunnel, "will surpass all previous TBMs" with a diameter of 19.25m and it is designed to construct a mega-tunnel to link both halves of the centre of Russia's second city St Petersburg under the River Neva and speed up traffic.
  • Tunnel driven by TBM
    August 7, 2020
    A major tunnel drive has been carried out by a TBM in Italy.