Skip to main content

Sykes Pumps ballasting expertise adds weight to Forth float-outs

UK hire specialist, Sykes Pumps, is playing a vital role in delivering Scotland’s biggest transport infrastructure project in a generation - The Forth Replacement Crossing (FRC). Once completed later this year, the new road bridge will be the longest three-tower cable-stayed bridge in the world. Forth Crossing Bridge Constructors (FCBC) consortium is using 42,000 tonnes of steel. Getting all that steel out into the Firth of Forth is a delicate operation. The project involves transferring 7,000tonne se
June 17, 2016 Read time: 2 mins
Sykes Pumps at work on Forth Replacement Crossing
UK hire specialist, 8165 Sykes Pumps, is playing a vital role in delivering Scotland’s biggest transport infrastructure project in a generation - The Forth Replacement Crossing (FRC).

Once completed later this year, the new road bridge will be the longest three-tower cable-stayed bridge in the world. Forth Crossing Bridge Constructors (FCBC) consortium is using 42,000 tonnes of steel.

Getting all that steel out into the Firth of Forth is a delicate operation. The project involves transferring 7,000tonne sections of prefabricated steel and concrete deck onto float-out barges using SPMT (self-propelled modular transport) vehicles.

For that reason, Sykes Pumps is playing a vital role in managing the ballast of the float-out operation being delivered by heavy lifting and engineered transport specialist, Sarens.

Sykes Pumps has provided Sarens with 50 of its general purpose GP 150M diesel pump.

The GP 150M, with the Sykes Univac vacuum system, is used wherever there's a need for positive self-priming. The pump primes and re-primes automatically from dry and is powered by a 20kW Lister engine with many optional configurations.

Sykes Pumps worked with Sarens to calculate the ballast requirements for the load-on and load-off manoeuvres. It also invested in additional fittings and butterfly valves for the pumps to provide dual suction and discharge, reducing the number of pumps and personnel required on site and optimising efficiency for the ballasting operation.

“We are using two load out vessels for the project, each with 25 pumps,” says Alister Smith, project manager at Sarens. “We have worked with Sykes Pumps several times before and knew that the company could ensure that water pumped into and out of the vessels’ tank compartments is calculated accurately.”

Sykes Pumps’ float-outs expert, Richard Box, said he could advise the client on dual suction and discharge pumping, enhancing the efficiency of the ballasting operation and ensuring the float-outs are completed safely in line with the construction programme.”

For more information on companies in this article

Related Content

  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.
  • The Cebu–Cordova Link Expressway
    September 19, 2021
    The 8.5km CCLEx, as it is known, will include the longest and tallest bridge in the Philippines when the structure is finished next year
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Diamond in the Pearl: China’s Hong Kong-Zhuhai-Macao Bridge complex
    March 8, 2018
    People in the Pearl River Delta are celebrating the Chinese New Year with the imminent opening of the Hong Kong-Zhuhai-Macao Bridge. David Arminas reviews progress. China’s Spring Festival, or Lunar New Year, is celebrated with the usual enthusiasm and spectacular fireworks. But celebrations will be particularly joyous for many people in the southern Pearl River Delta. The soon-to-be-open Hong Kong-Zhuhai-Macao Bridge (HZMB) will slash travel time between the Hong Kong Special Administrative Region, Zhuh