Skip to main content

Students received charges

Five Canadian students received criminal charges when a fun prank they planned went wrong. The engineering students had intended to lower the carcass of a Volkswagen Beetle car from the Iron Workers Memorial Bridge in Vancouver. The students clearly need to spend more time studying as they miscalculated the stresses involved and the cables they selected failed under the load. The car then fell into Vancouver harbour and the students were arrested and charged for causing over C$5,000 of damage. Canadian engi
February 23, 2012 Read time: 1 min
Five Canadian students received criminal charges when a fun prank they planned went wrong. The engineering students had intended to lower the carcass of a Volkswagen Beetle car from the Iron Workers Memorial Bridge in Vancouver. The students clearly need to spend more time studying as they miscalculated the stresses involved and the cables they selected failed under the load. The car then fell into Vancouver harbour and the students were arrested and charged for causing over C$5,000 of damage. Canadian engineering students have a history of car dangling attempts, which is used to publicise engineering week at the University of British Columbia.

Related Content

  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.
  • Race circuit milling job with machine control
    June 20, 2017
    The Misano racetrack in Italy has benefited from the use of the latest milling technology to deliver a new surface. Contractor Pesaresi Giuseppe decided to take advantage of the cutting-edge technologies of Wirtgen and Trimble. In less than three weeks, all irregularities were removed from the track, leaving it ready for motor sports racing. When the call for tender was issued to modernise the track, the construction of two new track sections was also planned. These plans included measures to boost safety
  • Pothole problem
    February 28, 2012
    A British driver suffered a particularly serious pothole problem recently, which resulted in his vehicle being seriously damaged. Flooding along the busy A464 in Shropshire caused subsidence under the road, which then entirely washed away a section of the surface leaving a 1.2m deep hole.
  • Mersey Gateway Project reaches half-way point across the Mersey
    March 10, 2017
    The Mersey Gateway project in England has passed a significant milestone, with over half of the main bridge deck stretching across the River Mersey. Work to install stay cables on the main bridge also passed a key point, with installation of the 31st 150m long cable – the halfway point for stay cable installations on the pylon. When complete, 146 stay cables will support the 1km-long reinforced concrete bridge, with a combined load-bearing weight of more than 53,000tonnes. “We’re now more than 50