Skip to main content

Students received charges

Five Canadian students received criminal charges when a fun prank they planned went wrong. The engineering students had intended to lower the carcass of a Volkswagen Beetle car from the Iron Workers Memorial Bridge in Vancouver. The students clearly need to spend more time studying as they miscalculated the stresses involved and the cables they selected failed under the load. The car then fell into Vancouver harbour and the students were arrested and charged for causing over C$5,000 of damage. Canadian engi
February 23, 2012 Read time: 1 min
Five Canadian students received criminal charges when a fun prank they planned went wrong. The engineering students had intended to lower the carcass of a Volkswagen Beetle car from the Iron Workers Memorial Bridge in Vancouver. The students clearly need to spend more time studying as they miscalculated the stresses involved and the cables they selected failed under the load. The car then fell into Vancouver harbour and the students were arrested and charged for causing over C$5,000 of damage. Canadian engineering students have a history of car dangling attempts, which is used to publicise engineering week at the University of British Columbia.

Related Content

  • Highways England tests ghostbusters
    March 9, 2021
    Highways England is testing seven new road marking products as part of a major international project to rid road surfaces of confusing ghost markings
  • The concrete option
    July 31, 2012
    Concrete highway construction techniques and technology continues to evolve. Mike Woof reports The recent increases in oil costs are having a knock-on effect for the road construction sector, as asphalt prices have increased noticeably and faster than those for concrete. This has spurred renewed discussion over which construction technique now offers the best long term solution for road building. The debate between those in favour of concrete and those preferring asphalt for highway construction has been on
  • Underground routes for highways
    July 20, 2012
    Increasingly, and where possible, roads are being built in tunnels often for environmental reasons, writes Patrick Smith As part of the new M7 motorway development in the southwest of Ireland, the four-lane route crosses the River Shannon near Limerick, before it flows into the Atlantic. Centrepiece of the 10km long Limerick Southern Ring Road is the required tunnelling (675m long), which including the north and south entrance and exit ramps, means it will be 915m long. Completion of the work is planned for
  • British Columbia awards Quartz Bridge deal
    March 22, 2021
    The Canadian province calls time on the old Quartz Creek Bridge.