Skip to main content

Students received charges

Five Canadian students received criminal charges when a fun prank they planned went wrong. The engineering students had intended to lower the carcass of a Volkswagen Beetle car from the Iron Workers Memorial Bridge in Vancouver. The students clearly need to spend more time studying as they miscalculated the stresses involved and the cables they selected failed under the load. The car then fell into Vancouver harbour and the students were arrested and charged for causing over C$5,000 of damage. Canadian engi
February 23, 2012 Read time: 1 min
Five Canadian students received criminal charges when a fun prank they planned went wrong. The engineering students had intended to lower the carcass of a Volkswagen Beetle car from the Iron Workers Memorial Bridge in Vancouver. The students clearly need to spend more time studying as they miscalculated the stresses involved and the cables they selected failed under the load. The car then fell into Vancouver harbour and the students were arrested and charged for causing over C$5,000 of damage. Canadian engineering students have a history of car dangling attempts, which is used to publicise engineering week at the University of British Columbia.

Related Content

  • The cycle of potholes in the UK
    October 1, 2019
    Since 2015 almost a million potholes have been recorded annually by UK local authorities, with the 2016 count reaching 1,088,965, according to an insurance provider.
  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en
  • Clever approach to reducing bridge vibrations
    November 14, 2013
    Reducing vibrations on a bridge, supplying high-quality binders to emerging countries and helping small and medium players with warm mix, this month’s stories showcase some innovative bitumen technology solutions - Kristina Smith reports The Kessock Bridge in the Highlands of Scotland has become the third bridge in the UK to be resurfaced with Gussasphalt. A dense mastic asphalt containing Nynas Endura N5, a polymer modified binder, Gussasphalt has been designed to have a longer life than standard mastic as
  • Premiere in the Black Forest
    October 5, 2023
    One of the steepest sections of the B 500, an important road in the southern Black Forest, had to be renewed in the summer of 2023 – more precisely: the first kilometres behind the Triberg town sign, past the famous waterfalls. Asphalt paving specialists from Gebrüder Bantle GmbH & Co. KG were commissioned to resurface the carriageway.