Stone Arch Bridge Rehabilitation

May 19, 2022 Read time: 3 mins

 

Rehabilitating an Historic Landmark

Spanning the Mississippi River in downtown Minneapolis, Minnesota, the 140-year-old Stone Arch Bridge is a former railroad bridge crossing recognized as a National Civil Engineering Landmark. In the early 1990s, the Minnesota Department of Transportation (MnDOT) converted the 2,100-foot-long masonry bridge into a pedestrian and bicycle pathway. To ensure public safety and cultural value of the bridge, MnDOT hired Collins Engineers to assess and restore the structural integrity of the bridge. Given the age and size of the structure, Collins faced challenges when developing repair plans that traditional data collection methods could not accommodate.

Digitalizing Inspection and Design

To identify structural deficiencies and develop repair plans, Collins needed detailed information on the condition of masonry for the entire bridge, including stone arches, embankments, piers, and underwater foundations. Conventional workflows would be time consuming, significantly impact public use of the bridge, and might not produce the level of detail required to generate accurate repair plans. While Collins used reality modeling technology on previous projects, they realized that for this large and complex structure, they needed an integrated digital survey, modeling, and inspection solution to collect sufficiently detailed data to accurately model the bridge.

Leveraging a Mixed Reality Environment

Bentley 2
image courtesy of Collins Engineers

Collins selected ContextCapture to generate a high-fidelity 3D model as the basis of a digital twin of the Stone Arch Bridge from over 13,000 drone captured images. Using Bentley’s reality modeling and digital twin applications, they performed virtual inspections and established a mixed reality environment for the team and public to view the digital twin of the bridge and gain a better understanding of the restorative design works. Traditionally, inspection notes were recorded and communicated using pencil and paper, accompanied by photos, that lacked the necessary detail to make definitive decisions and safely complete the project. However, working with the 3D digital twin meant the field team could inspect the bridge remotely, record their findings directly on it, and accurately pinpoint the areas in need of repair.

Digital Twins Drive Lifecycle Benefits

Using advanced digital technologies to survey the bridge allowed Collins to shorten the time that the bridge was out of service during inspection, limiting pathway closure to just four days. Working in a mixed reality environment using an accurate digital twin of the bridge, they saved 20% in field time and improved the quality and quantity of data collected, facilitating more informed decision-making to reduce risk and cost. The digital twin will enable contractors to deliver more competitive bids, which is expected to save MnDOT 10% to 15% in construction costs. Collins will extend the use of digital twins beyond design and construction for future lifecycle planning and maintenance, ensuring that the bridge continues to remain structurally safe and a valuable cultural asset to the city and state.

To find out more click here.

Content produced in association with Bentley Systems

For more information on companies in this article

Related Content

  • New Bocimi Toll Road Aims to Reduce Travel Time and Boost Indonesia’s Economy
    April 20, 2023
    The Bogor-Ciawi-Sukabumi (Bocimi) toll road is a series of national strategic projects to help reduce traffic congestion along the existing factory-lined roadway, as well as enhance regional connectivity and tourism in West Java. Spanning 54 kilometers, the new highway corridor is expected to shorten travel time between the Bogor and Sukabumi provinces from two hours to 30 minutes and boost economic conditions in the surrounding Sukabumi area. Construction is divided into four phases, the first of which measures 15.35 kilometers and is already complete. PT Waskita Karya (Waskita) is the main contractor for the IDR 2.1 trillion second section, spanning 11.9 kilometers between Cigombong and Cibadak, and set for completion in 2023 after being delayed due to the pandemic.
  • Beca Uses 3D Design and a Collaborative Environment on Takitimu North Link Project
    May 25, 2023

    The western Bay of Plenty region in New Zealand, south of Auckland on the North Island, is one of the fastest-growing regions in the country. Growing traffic in the area, with many serious crashes, strained road systems. To improve safety, access, travel options, and to support economic development in the area, Waka Kotahi NZ Transport Agency initiated the Takitimu North Link project.

  • AFRY Helps Scania Drive Toward Sustainable Transport with New Autonomous Vehicle Test Track
    March 10, 2023
    With the rapid development of autonomous and electrified vehicles, Swedish heavy truck and bus manufacturer Scania is developing a new test track in Södertälje, 40 kilometers southwest of Stockholm. To design the track to simulate multiple scenarios, Scania hired AFRY for their design and engineering expertise. The test track includes 19 kilometers of roads with more than 60 intersections and junctions, though complex, hilly ground conditions that will make layout difficult. Since changing any single element would impact numerous others, AFRY needed a flexible, accessible design environment.
  • Rebuilding a critical transportation artery in Italy
    September 7, 2020
    Software from Bentley Systems has played an important role in the Morandi Bridge replacement project