Skip to main content

Stedman H-Series cage mill produces finer grind

Stedman’s new H-54 cage mill features improved productivity and a finer, more uniform grind, the company said at CONEXPO-CON/AGG 2017. “It puts more energy into the materials than any other size-reducer in the market,” said Harold Coleman, marketing coordinator at Stedman, based in Aurora, Indiana. “There’s normally no need for secondary screening.”
March 9, 2017 Read time: 2 mins
The H-54 cage mill typically eliminates the need for secondary screening.

8595 Stedman’s new H-54 cage mill features improved productivity and a finer, more uniform grind, the company said at CONEXPO-CON/AGG 2017.

“It puts more energy into the materials than any other size-reducer in the market,” said Harold Coleman, marketing coordinator at Stedman, based in Aurora, Indiana. “There’s normally no need for secondary screening.”

That productivity is consistent across many materials. “It’s best at pulverizing, grinding, crushing and mixing abrasive and non-abrasive materials – wet, sticky or dry,” Coleman said.

The H-Series can handle up to 240 tons per hours and is reversible for extended wear life, the company said.

The H-Series Cage Mills feature a quick-open housing for efficient inspection and maintenance. Each H-Series impact mill housing can accommodate two-, four-, or six-row cage assemblies. This versatility is further enhanced by the capability to vary the number of pins in each row – and to adjust the rotational speed of each cage in relation to the others. The operator also can change the relative direction of the cage rotations.

For wet material applications, air cannons are mounted at the intake and discharge to help prevent build-up. A hydraulically-operated, quick-opening retractor provides rapid access to crushing components for inspection or changeout.

The quick-opening feature allows pre-scheduling of downtime for parts changeout based on regular inspections. Inspection requires about five minutes, complete changeout of wear components as little as one hour, or less.

For more information on companies in this article

Related Content

  • New Kleemann impactors are Tier 4 Final-compliant
    March 7, 2014
    Kleemann has launched two new impact crushers, the Mobirex MR 110 ZSi EVO 2 and MR 130 Zi EVO 2. “EVO 2 represents the continuing evolution of the successful EVO Contractor Line, with additional benefits in terms of economy and operational safety,” said Mark Hezinger, marketing manager. The new impact crushers are differentiated by their size and productivity with the MR 110 ZSi EVO 2 having a crusher inlet opening of 1,100mm, and the MR 130 Zi EVO 2 a crusher inlet opening of 1,300mm. These provide feed
  • New Kleemann impactors are Tier 4 Final-compliant
    January 6, 2017
    Kleemann has launched two new impact crushers, the Mobirex MR 110 ZSi EVO 2 and MR 130 Zi EVO 2. “EVO 2 represents the continuing evolution of the successful EVO Contractor Line, with additional benefits in terms of economy and operational safety,” said Mark Hezinger, marketing manager. The new impact crushers are differentiated by their size and productivity with the MR 110 ZSi EVO 2 having a crusher inlet opening of 1,100mm, and the MR 130 Zi EVO 2 a crusher inlet opening of 1,300mm. These provide feed
  • Long reach equipment simplifies demolition
    February 14, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life.
  • Long reach equipment simplifies demolition
    April 13, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life. Many of the ultra long boom machines are designed