Skip to main content

SRL’s outta sight variable message signs

The system from SRL Traffic Systems for England’s National Highways agency is displaying wording for road works not usually used to warn motorists, including ‘Working even out of view’.
By David Arminas January 8, 2025 Read time: 3 mins
Just because you don’t see us…

England’s National Highways agency is using a variable message sign to display non-regulatory messages to indicate that maintenance teams may be out of sight.

The is the first time that such messages have been displayed in an effort to better communicate to drivers that ahead lay obstacles, diversions road works. The system from SRL Traffic Systems is displaying wording not usually used, including ‘Working even out of view’, to provide an awareness of operations not within eyesight of a driver or outside of the public eye.

Last October, under the initiative by SRL Traffic Systems and road maintenance provider Kier and in collaboration with National Highways, installed the signs in a contraflow section of the A417 Missing Link project. It was done as part of National Highways’ Electronic Boards for Roadworks review and resulting guidelines.

The implementation of the review’s recommendations represents a significant advancement in how project teams communicate with road users during construction activities on England’s Strategic Road Network. The agency said that the aim of guidelines is to provide project teams with best practice for effective use, monitoring and updating of electronic boards. Unlike traditional portable variable message signs, electronic boards are designed to offer a more user-friendly approach to information dissemination during roadworks.

Industry research has shown that messages which can be read within four seconds are better for our road users. Previously, signs presented yellow text on a black background. The new signs display concise, friendly messages in white text over a black background.

SRL said that National Highways can now display messages using more options, such as text colour and border additions.

The agency will be able to use the signs more as electronic billboards than traditional variable message signs, explained Nick Nandhra, project manager for National Highways. “These new signs mark a significant advancement in our goal to enhance road user experiences,” said Nandhra. “Clear communication during roadworks is crucial.”

Kier and SRL Traffic Systems are collaborating to maintain signage and provide real-time updates.

Caroline Weller, variable message sign manager at SRL Traffic Systems, said the sign on the A417 Missing Link project is the first scheme to be completed using the agency’s new guidelines.

Gavin Jones, Kier’s project director, said Kier is confident that the signs will assist motorists travelling through the A417 and improve their journeys.

Meanwhile, National Highways said it will continue refining messages based on road user insights, addressing road user concerns and keeping messages relevant throughout each project phase.

The guidelines for electronic boards can be found and downloaded by clicking here.


 

For more information on companies in this article

Related Content

  • Need for defined work zone safety regulations
    April 12, 2012
    Christophe Nicodème, ERF's Director General, explores a missing link in the road safety chain Road works are an essential part of the work of public administrations and toll operators; aimed at preserving a safe road infrastructure for users, while minimising the disruption caused as a result of unavoidable traffic interventions. Given the essential role of road works, one would assume that well-defined regulations exist at national and European level to determine the best way of conducting them. Yet
  • Balfour Beatty awarded €54.01 million A1 improvement scheme
    June 5, 2014
    Balfour Beatty has been awarded a €54.01 million (£43.9 million) contract to design and build the Highways Agency A1 Coal House to Metro Centre improvement scheme in Gateshead, north-east England. The project will include the introduction of new parallel link roads between the Lobley Hill and Gateshead Quay (A184) junctions and an increase in lane capacity on the A1 main line from two to three lanes in each direction from the Metro Centre to Coal House junction, a distance of 6.44kms.
  • The A14 Cambridge to Huntingdon improvement scheme takes shape
    May 31, 2017
    Highways England’s project manager gives sneak peek into progress on the UK’s biggest road upgrade now under construction. Road construction workers often find interesting buried items when building roads and the UK’s A14 Cambridge to Huntingdon improvement scheme is proving the point. It’s been less than half a year since construction started on the €1.76 billion A14 scheme, Highways England’s largest ongoing project. Highways England is the wholly government-owned company responsible for modernising, main
  • Highways England reappoints Mott MacDonald to Change Advisory Board
    June 14, 2018
    Mott MacDonald will continue to manage Highways England’s Change Advisory Board and its websites for technical specifications four years after the initial appointment. The contract is due to finish in 2020, with the potential to extend service provision for two six-month increments at the end of the first year. Mott MacDonald said that the board is the essential forum which safeguards the technical development of Highways Agency Traffic Management Systems. Highways England relies on it to control its