Skip to main content

SRL’s outta sight variable message signs

The system from SRL Traffic Systems for England’s National Highways agency is displaying wording for road works not usually used to warn motorists, including ‘Working even out of view’.
By David Arminas January 8, 2025 Read time: 3 mins
Just because you don’t see us…

England’s National Highways agency is using a variable message sign to display non-regulatory messages to indicate that maintenance teams may be out of sight.

The is the first time that such messages have been displayed in an effort to better communicate to drivers that ahead lay obstacles, diversions road works. The system from SRL Traffic Systems is displaying wording not usually used, including ‘Working even out of view’, to provide an awareness of operations not within eyesight of a driver or outside of the public eye.

Last October, under the initiative by SRL Traffic Systems and road maintenance provider Kier and in collaboration with National Highways, installed the signs in a contraflow section of the A417 Missing Link project. It was done as part of National Highways’ Electronic Boards for Roadworks review and resulting guidelines.

The implementation of the review’s recommendations represents a significant advancement in how project teams communicate with road users during construction activities on England’s Strategic Road Network. The agency said that the aim of guidelines is to provide project teams with best practice for effective use, monitoring and updating of electronic boards. Unlike traditional portable variable message signs, electronic boards are designed to offer a more user-friendly approach to information dissemination during roadworks.

Industry research has shown that messages which can be read within four seconds are better for our road users. Previously, signs presented yellow text on a black background. The new signs display concise, friendly messages in white text over a black background.

SRL said that National Highways can now display messages using more options, such as text colour and border additions.

The agency will be able to use the signs more as electronic billboards than traditional variable message signs, explained Nick Nandhra, project manager for National Highways. “These new signs mark a significant advancement in our goal to enhance road user experiences,” said Nandhra. “Clear communication during roadworks is crucial.”

Kier and SRL Traffic Systems are collaborating to maintain signage and provide real-time updates.

Caroline Weller, variable message sign manager at SRL Traffic Systems, said the sign on the A417 Missing Link project is the first scheme to be completed using the agency’s new guidelines.

Gavin Jones, Kier’s project director, said Kier is confident that the signs will assist motorists travelling through the A417 and improve their journeys.

Meanwhile, National Highways said it will continue refining messages based on road user insights, addressing road user concerns and keeping messages relevant throughout each project phase.

The guidelines for electronic boards can be found and downloaded by clicking here.


 

For more information on companies in this article

Related Content

  • Warm mix asphalt offers green solution
    September 4, 2019
    A new report from the UK highlights that utilising warm mix asphalt (WMA) can help cut CO2 emissions. The All-Party Parliamentary Group on Highways has issued a report highlighting how the use of WMA can reduce carbon emissions and improve efficiencies on highways projects. WMAs are manufactured and laid at lower temperatures than traditional asphalts, using less energy and delivering carbon savings without compromising performance. Their use can reduce CO2 emissions associated with asphalt production for
  • Simex: Road Maintenance
    October 26, 2023
    In the world of road maintenance and paving, as well as construction, the issue of recovering material deriving from demolition and scarification is becoming increasingly urgent, with the dual objective of combining environmental protection with economic savings. Those who work in the sector are well aware of the huge costs of transporting and disposing of asphalt and material from demolition, as well as the costs for the purchase and transport of new raw materials to the site. Now, as never before, the sector features its own circular economy, particularly in regards to bituminous conglomerates: road paving can be recycled several times, in full compliance with the regulations in force.
  • Severn Bridge to have weight restrictions
    April 15, 2025
    The restrictions start May 27 when heavy goods vehicles must use the nearby cable-stayed M4 motorway Prince of Wales Bridge between England and Wales.
  • Attitude is key to sustainability, says Volvo CE’s Thomas Bitter
    June 27, 2018
    Whether you are in the global Volvo Ocean Race or working on-site locally, sustainability is about attitude as much as technology. David Arminas reports. Technology, sustainability and safety. We ignore these often related themes at our peril. This was the key point made by Volvo Group chief executive Martin Lundstedt during his brief opening presentation at the start of the Building Tomorrow Conference in Spain last October. The conference took place within the harbour of Alicante that was bustling wit