Skip to main content

Speedy repair for key UK motorway

Major road repairs have been carried out on the UK’s busy M25 motorway. Stirling Lloyd's Safetrack Crack Infill is helping to reinstate major sections of London's M25 orbital motorway.
October 2, 2014 Read time: 1 min
Fast road repairs are possible with the new technique from Stirling Lloyd

Major road repairs have been carried out on the UK’s busy M25 motorway. 2314 Stirling Lloyd's Safetrack Crack Infill is helping to reinstate major sections of London's M25 orbital motorway.

The repair work to fretted lane joints within carriageways of the M25 is being undertaken as part of a Design, Build, Finance and Operate (DBFO) contract for the Highways Agency by leading road marking and repair specialist LMS Highways. The MMAX lorry-mounted repair system provides a fast, cost-effective and safe solution and uses a specially formulated version of Stirling Lloyd's HAPAS-approved Safetrack Crack Infill, which is based on the company's advanced fast-curing reactive resins.

Recent M25 repair work has been completed on the motorway's northern sections from junctions 22 to 25 around South Mimms and at junction 5 near Godstone, with Stirling Lloyd developing a bespoke concrete grey coloured system to blend in with the road surface.

For more information on companies in this article

Related Content

  • Balfour Beatty awarded €54.01 million A1 improvement scheme
    June 5, 2014
    Balfour Beatty has been awarded a €54.01 million (£43.9 million) contract to design and build the Highways Agency A1 Coal House to Metro Centre improvement scheme in Gateshead, north-east England. The project will include the introduction of new parallel link roads between the Lobley Hill and Gateshead Quay (A184) junctions and an increase in lane capacity on the A1 main line from two to three lanes in each direction from the Metro Centre to Coal House junction, a distance of 6.44kms.
  • More tenders for Lower Thames Crossing
    April 1, 2021
    The winners will build 23km of road connecting to the UK’s longest road tunnel.
  • UV lining is highway drainage first for UK motorway upgrade
    December 19, 2017
    Drainage specialist Lanes Group is implementing the first project to extensively line highway drainage pipes as part of a Smart Motorway initiative in the UK. Lanes has been commissioned by the Carillion Kier Joint Venture working for Highways England to install ultra-violet – UV - liners during the M6 Junction 16-19 Smart Motorway scheme between Crewe and Knutsford, in county Cheshire. Lanes said that it is the first time that roadside drainage pipes will have been extensively lined, instead of being
  • Busy UK motorway junction demolished in tight time frame – Mark Anthony reports
    October 18, 2012
    Military-style planning and overwhelming demolition firepower ensured that Armac Group avoided financial penalties and the wrath of drivers on one of the UK’s busiest motorway intersections. Demolition & Dismantling reports. 6 January is traditionally known for the visit of the three wise men to Bethlehem. However, on 6 January 2012, three wise demolition engineers from Armac Group was tasked with dismantling the monumental structure known as Catthorpe Viaduct: the main overbridge of the M6/M1/A14 interc