Skip to main content

Speedy repair for key UK motorway

Major road repairs have been carried out on the UK’s busy M25 motorway. Stirling Lloyd's Safetrack Crack Infill is helping to reinstate major sections of London's M25 orbital motorway.
October 2, 2014 Read time: 1 min
Fast road repairs are possible with the new technique from Stirling Lloyd

Major road repairs have been carried out on the UK’s busy M25 motorway. 2314 Stirling Lloyd's Safetrack Crack Infill is helping to reinstate major sections of London's M25 orbital motorway.

The repair work to fretted lane joints within carriageways of the M25 is being undertaken as part of a Design, Build, Finance and Operate (DBFO) contract for the Highways Agency by leading road marking and repair specialist LMS Highways. The MMAX lorry-mounted repair system provides a fast, cost-effective and safe solution and uses a specially formulated version of Stirling Lloyd's HAPAS-approved Safetrack Crack Infill, which is based on the company's advanced fast-curing reactive resins.

Recent M25 repair work has been completed on the motorway's northern sections from junctions 22 to 25 around South Mimms and at junction 5 near Godstone, with Stirling Lloyd developing a bespoke concrete grey coloured system to blend in with the road surface.

For more information on companies in this article

Related Content

  • IAM suggests confusion over UK’s SMART motorways
    April 13, 2015
    The Institute of Advanced Motorists (IAM) has expressed concern that widespread confusion exists amongst UK drivers on how best to use SMART motorways. These were officially introduced around this time in 2014 to replace Managed Motorways as the solution to the UK’s congested major routes. However concerns have been raised over the safety of the SMART motorways. England’s first all-lane running motorway, without a hard shoulder, was the 2.5km stretch of the M25 between junctions 23 and 25. Complete schemes
  • Innovative new drainage solutions will help keep roads free from water
    October 2, 2014
    An array of new technologies will help optimise road drainage and minimise flooding risks - Mike Woof reports In the UK the specialist contractor Lanes Group has carried out extensive inspection work of the drainage systems for the M6 toll route around the city of Birmingham. A powerful zoom camera has been used to carry out the inspection work for Midland Expressway, which operates and maintains the 43km-long motorway, running from Coleshill to Cannock.
  • Delta Bloc solution for major upgrade to UK’s M6 motorway
    February 8, 2018
    Delta Bloc’s structural precast concrete barriers have been supplied for a €308 million smart motorway project being undertaken by Highways England on the M6 Motorway. UK contractor Charcon Construction Solutions worked with Delta Bloc UK, which develops, manufactures, supplies and installs permanent and temporary concrete road safety barriers. The Highways England scheme between junction 16 at Crewe and junction 19 at Knutsford has seen a new 32km concrete safety barrier installed in the central reservat
  • Looking around the world with bitumen technology
    March 4, 2015
    Russia needs polymer-modified bitumen; the UK is embracing US-style pavement preservation technology and gearing up to import more bitumen; and Italy prepares to export innovative modifying technology; plus a look at the market in Asia Pacific and the Middle East – Kristina Smith reports. The Total Group has announced two recent deals which underline the changing bitumen market around the world. In Moscow, it is constructing a new type of polymer-modified bitumen (PMB) plant in joint venture with Gazprom Ne