Skip to main content

Spanish contractor Sorigué has the edge with VÖGELE SprayJet

Spanish contractor Sorigué, the first to use the SUPER 1800-3i SprayJet from Vögele, has pioneered paving thin overlays and the development of new mixes. The company won the contract for rehabilitating the surface course of the 3km-long dam, 10m-wide promenade in the Catalonian port city of Tarragona. Sorigué’s idea was to overlay the existing surfacing with a thin layer applied to a spray seal of polymer-modified bitumen. The spray seal prevents water penetrating inside the structure – a major advant
March 21, 2016 Read time: 3 mins
Spanish contractor Sorigué, the first to use the SUPER 1800-3i SprayJet from 1194 Vögele, has pioneered paving thin overlays and the development of new mixes.

The company won the contract for rehabilitating the surface course of the 3km-long dam, 10m-wide promenade in the Catalonian port city of Tarragona. Sorigué’s idea was to overlay the existing surfacing with a thin layer applied to a spray seal of polymer-modified bitumen.

The spray seal prevents water penetrating inside the structure – a major advantage for a dam promenade which is regularly flooded with seawater because of strong winds and heavy seas. Sorigué says the process is cost-effective because the thinner layer significantly reduces milling and material costs. There is no need for costly adjustments and the installation of new curbs. It is also time-saving because spraying the high-quality polymer-modified bitumen and paving the surface course can take place in a single pass.

Lastly, pavement rehabilitated by paving thin overlays are exceedingly durable. The sprayed binder forms a continuous film on the lower layer, effectively sealing the road structure against water and significantly extending the service life of the new pavement.

The job was done in less than two days.  

In order to produce a particularly high-quality bond between layers when overlaying the surface course, Sorigué used an emulsion called ELASTAM. It was developed by the company itself and contains 65% polymer-modified bitumen and 35% water. The polymer-modified emulsion guarantees very rapid “breaking” so that the film of emulsion can be overlaid with hot asphalt immediately after spraying.

The SprayJet module ensures that the emulsion is sprayed in the right quantity. Unlike the case when using conventional methods, job site vehicles and paver do not drive over the film of emulsion, so that it remains intact over the full width.

The set rate of spread was relatively high, at 1.1kg/m². “Using a high rate of spread produces a reliable tack coat on all bases and ensures a strong bond between the layers,” said Alfredo Bobis, product developer for Sorigué. “It also allows more bitumen to be mixed into the asphalt retroactively. All this extends the service life of the new surfacing in line with demands for sustainable road construction.”

The Dash 3 SprayJet module and automatic functions calculates optimum pave speed on the basis of the installed nozzle size and the selected rate of spread, guaranteeing perfect application of the emulsion.

Operation of the SprayJet module has been consistently integrated into the ErgoPlus 3 operating concept. The central element is the colour touch screen, positioned on the emulsion tank so it is easily be seen and reached by the paver operator. All preparatory, spraying and cleaning functions can be selected and started in a few swift moves via various menus. Settings for the work flows are mainly performed automatically. This assures the machine’s availability and long-term value and prevents potential operator errors.

For more information on companies in this article

Related Content

  • GPS control delivers more accurate compaction performance
    July 13, 2012
    The latest compaction technology offers users the benefits of more accurate performance by combining heat detection and compaction metering with GPS In Europe several leading manufacturers now offer more accurate compaction technology, with Ammann, BOMAG, Dynapac and Hamm all having developed advanced control packages. The technologies vary widely but the advantages are broadly similar, with smart compaction allowing the user a greater degree of control over the compaction process and delivering major reduc
  • Speedy airport upgrade
    February 15, 2012
    Increases in flight numbers from the Frankfurt Hahn airport have resulted in necessary improvements to the facility, including new runway surfaces. The former German military airbase has been used as a civilian airport since 1993 but is now Germany's fifth largest air cargo hub and handles some 40,000 flights/year.
  • Efficient recycling and soil stabilisation from Wirtgen 
    October 26, 2022
    Wirtgen says that its latest WR recyclers/stabilisers are more efficient due to the development of the new Resource Efficiency System (RES). This increases the degree of automation in the overall process, boosting efficiency.
  • Steel sealed on Stonecutters Bridge
    February 6, 2012
    The stone mastic asphalt surface being laid on the bridge deck. The Stonecutters Bridge in Hong Kong, the second longest spanning cable stayed bridge in the world, is a dual three-lane crossing of the Rambler Channel. It utilises 33,500tonnes of structural steel in the bridge deck; 32,000m3 of concrete in the towers and 65 steel deck units relying on 224 cables. Effectively protecting the megastructure's deck from the weather extremes (monsoon rains and extreme heat in the summer) and the high levels of tra