Skip to main content

Soilmec’s compact piling rig works in tight spots

Italian drilling, piling and foundation equipment specialist Soilmec is introducing its compact SM-4 rig designed to create sectional flight auger (SFA) piles, a technique that uses sectional lengths of a hollow stem continuous flight auger. Soilmec says that the new machine is ideal for “job sites with low head room or very restricted (access),” and in situations that “a CFA rig cannot reach.” Once the SM-4 is on site, “each section, commencing with a toothed lead auger, is added to the rig as the auger
January 6, 2017 Read time: 3 mins
The SM-4 is a compact, powerful and technically advanced drilling rig that will allow you to work in the tightest of spots
Italian drilling, piling and foundation equipment specialist 2959 Soilmec is introducing its compact SM-4 rig designed to create sectional flight auger (SFA) piles, a technique that uses sectional lengths of a hollow stem continuous flight auger. Soilmec says that the new machine is ideal for “job sites with low head room or very restricted (access),” and in situations that “a CFA rig cannot reach.”

Once the SM-4 is on site, “each section, commencing with a toothed lead auger, is added to the rig as the augers are bored into the ground,” says Soilmec. “When the required depth is reached, grout is mixed and pumped through the rotary and down the hollow stem of the augers as they are extracted and removed. Piles can therefore be made in wet unstable ground conditions. Sectional flight augers are also used, in certain soil conditions, for open bore piles.  The auger sections are extracted fully before the grout is cast in the open bore.”

In terms of its spec, the compact SM-4 rig unit uses retractable crawlers and stabilisers, allowing the rig to achieve a minimum width of 740mm and a minimum tracking height of 1,980mm.  The casing clamp system is also 740mm wide and a separate power pack mounted on the crawlers has been introduced to allow independent tracking around the site. It can move a reasonable distance too … the unit has 20m to 50m of hydraulic hoses between the power pack and the rig.  This would enables the rig to work, for example, inside a tunnel or under a low bridge while the power pack remains outside.  The rig has a 115kW Tier 4i diesel engine, a fixed boom, a sliding mast and a side mast movement of +/- 45 degrees.  The telescopic mast has a feed stroke range of 1.5-2.5m, giving low head room operating capability. The cylinder crowd system gives 70kN of maximum hoist force and the rotary head has 3347daNm of maximum torque with a 102mm swivel. The swan neck and hollow shaft design allow for concrete injection.  

Other things to look out for on the SM-4 are a remote control operating system for drilling, positioning and tracking and a safety-conscious double-hinged safety guard and slow rotation system that complies with the new Euro Legislation EN16228 standard. “This enables easy removal of the front panels when working close to a wall, using the already interlocked side panels for access to the auger string for loading and unloading sections,” says Soilmec.

For more information on companies in this article

Related Content

  • Australian bridge slides into position
    July 18, 2012
    A heavy rail crossing as part of Australia's EastLink motorway demanded great ingenuity and careful planning Most of the 88 bridges on the EastLink tolled motorway in, Melbourne, Australia were kept as simple and straightforward as possible. Contractor Thiess John Holland (TJH) developed its own precast yard 150km from the city, which provided many of the prefabricated materials required for the structures. This offered speed and economy while logistics and sequencing were vital for their erection. But the
  • Kobelco re-launches SK17SR-3E mini excavator
    May 25, 2021
    The SK17SR-3E’s cabin now has a deluxe Grammar-branded reclining seat and there are wrist rests have been integrated to further reduce operator fatigue.
  • Italy's strategic tunnel link
    August 21, 2012
    The world's largest tunnelling machine is completing Italy's important road connection between Bologna and Florence - Adrian Greeman reports For just under a decade a huge programme of highway construction has been underway in the mountainous region between Bologna and Florence, realigning a section of the A1 highway nearly 70km long. The new section, through major tunnels and across high viaducts, will greatly increase capacity on Italy's most important highway.
  • Tunnels - an environmentally attractive option?
    February 21, 2012
    While tunnels are often more expensive than bridges, they can offer environmentally attractive options for transport schemes. Tunnels offer environmentally attractive options for a range of transport infrastructure schemes, but in many cases high construction costs may restrict their use.