Skip to main content

Snow removal: a right way and a wrong way

Snow. That winter menace for road users. Often it catches drivers unaware; often its efficient removal is planned for by road authorities. Some regions and countries get more snow than others, such as Scandinavia, northern Europe and North America, and are better at it.
June 12, 2015 Read time: 1 min

Snow. That winter menace for road users. Often it catches drivers unaware; often its efficient removal is planned for by road authorities.

Some regions and countries get more snow than others, such as Scandinavia, northern Europe and North America, and are better at it.

Everyone has stories to tell about snow removal from roads. There are good examples of how to do it efficiently, such as this clip from Canada. The trucks could be in some kind of ballet movement – precise where every driver has their actions timed to perfection: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal https://www.youtube.com/watch?v=lUds1pWKMjs Watch the Sno removal from roads video here false http://www.youtube.com/watch?v=lUds1pWKMjs false false%>

Sadly, that is not always true as this video from Kazakhstan shows, starting at around 40 seconds into the clip: %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal http://www.carscoops.com/2015/02/kazakhstan-has-funny-way-of-cleaning.html Kazahstan Snow plough video link here false http://www.carscoops.com/2015/02/kazakhstan-has-funny-way-of-cleaning.html false false%>

Related Content

  • Doka showcases Cut&Cover tunnel construction solution
    January 6, 2017
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Doka showcases Cut&Cover tunnel construction solution
    February 7, 2013
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • IRF Examiner launched as industry resource to boost efficiency
    May 19, 2014
    Volume 1 highlights life-saving role of new methods and proven technologies around the world Since the IRF’s establishment in 1948, knowledge transfer has been the core of what the IRF does best. As industry tools and procedures evolve to meet societies’ needs, the availability of global knowledge resources is now more important than ever.
  • Lintec showcases redesigned CSD 1500 plant at bauma
    February 12, 2013
    Especially redesigned to allow hot and cold recycling, Lintec will be showcasing its new CSD 1500 asphalt mixing plant at bauma. With a capacity of 120 tonnes/hour, the new CSD 1500 enables the integration of a hot storage silo with a 50tonne capacity. Similar to all Lintec’s CSD line plants, the aggregates enter the screen drum through the front wall.