Skip to main content

SmicoSymons offers new hydraulic screen media system

SmicoSymons, formed from Smico Manufacturing and Symons Screens, offers what it claims is the screening industry’s first hydraulically-operated opening and closing clamp rail system for fast change-outs of worn or broken tensioned screen media on one or more decks simultaneously. With a push of one or more buttons, clamp rails on selected decks or all decks will hydraulically open. Once replacement media is in place, one or more buttons will close and tighten the clamp rails to the specified distance from
January 6, 2017 Read time: 2 mins
7598 SmicoSymons, formed from Smico Manufacturing and Symons Screens, offers what it claims is the screening industry’s first hydraulically-operated opening and closing clamp rail system for fast change-outs of worn or broken tensioned screen media on one or more decks simultaneously.

With a push of one or more buttons, clamp rails on selected decks or all decks will hydraulically open. Once replacement media is in place, one or more buttons will close and tighten the clamp rails to the specified distance from screen box walls until they achieve the proper even tension.

According to the company, the technology reduces costly downtime to change out worn screens from an average of 8-12 hours on common size triple-deck screens to 3-4 hours and since change-outs require far fewer hours, producers can capitalise on more product flexibility from the same screen boxes.

“Screen media is expected to perform longer due to the hydraulic clamp rail system’s consistent tensioning, reducing the frequent problem of breakage with improperly manually tensioned screen media. The system may significantly reduce one of the primary causes of worker’s compensation claims, changing screen media,” says SmicoSymons.
www.Smico.com

For more information on companies in this article

Related Content

  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w
  • Liebherr invests hard for long-term growth as group sales slip to just under US$12.4bn (€9bn)
    January 6, 2017
    The giant construction equipment, mining, cranes and automation systems manufacturer Liebherr recorded group sales of just under US$12.4bn (€9bn) in 2013, $137m (€100m) down on the previous year. The privately-owned company suffered a 4% drop in turnover in its construction and mining division, which turned over $7.7bn (€5.62bn) last year.
  • Liebherr invests hard for long-term growth as group sales slip to just under US$12.4bn (€9bn)
    March 4, 2014
    The giant construction equipment, mining, cranes and automation systems manufacturer Liebherr recorded group sales of just under US$12.4bn (€9bn) in 2013, $137m (€100m) down on the previous year. The privately-owned company suffered a 4% drop in turnover in its construction and mining division, which turned over $7.7bn (€5.62bn) last year.
  • Atlas Copco introduces WEDA small pump range to American market with 60Hz variants
    January 6, 2017
    Atlas Copco’s WEDA electric submersible pumps make their debut on the American market with a new range for professional users. The new additions to the range are 1hp and under, c-UL-us approved, 60Hz single-phase drainage, sludge and residual pumps. They come in two voltage variants, 115V and 230V, and join the 50Hz range that is already popular in Europe and in the rest of the world.