Skip to main content

Smart solutions for construction

Intelligent solutions for the construction sector are now coming to market
By MJ Woof January 21, 2025 Read time: 2 mins
Smart solutions offer efficiency for construction sites


Oevermann, a German construction company, has been seeking to improve its use of digital solutions across sites to cut costs and boost productivity.

Based in Meschenich, Cologne, one of Oevermann’s most recent projects was to deliver a core new transport system - the B51N. This road route was built to improve safety and reduce the amount of traffic for local residents. 

Oevermann needed to consider the impact of its work across the countryside, with daily deliveries between 500㎥ and 900㎥ of fill material arriving at the site for distribution by the team.

By utilising the Dashboard functionality from Komatsu Smart Construction, the Oevermann team was able to assess the amount of material being pushed by the fleet into position, while filling the cut space through the collection of as-built data that was used to create a digital twin. 

The collected as-built data was also able to differentiate between the materials being used on site, enabling the site managers to have full tracking capability of the supply throughout construction. Through the use of Dashboard, contractors could also analyse the cost of the cut and fill process, allowing teams to ensure quoting and budgeting was accurate, improving profitability informed by data. 

A digital twin also offers the site manager the ability to compare the most recent as-built terrain surface with the intended design file, making it easier to understand how far the project has progressed.

In the case of the construction of the B51N, the Oevermann team was able to unlock a system that managed staff requirements on site more efficiently and informed the team that a smaller dozer was required to move materials, reducing costs.

Surveying costs were largely eliminated  as drone data enabled teams to avoid the need for surveyors to monitor the site, providing extensive savings over the 18-month project. 


 

For more information on companies in this article

Komatsu

Related Content

  • Asecap Days – Istanbul 2023
    February 16, 2024
    The “vast lakes of data” collected daily by global highway operators are going to waste meaning opportunities to improve services and boost revenue are continually lost. This must change, reports Geoff Hadwick from the ASECAP Days 2023 conference in Istanbul.
  • Safe construction amidst challenging times
    August 24, 2020
    Taking a steer on health and safety is crucial in these challenging times
  • Customer Comes Full Circle with Komatsu iMC 2.0
    April 4, 2022
    In 2017, the Budorealizacja company from Myślenice, Poland started using the first ever Komatsu intelligent Machine Control (iMC) excavator to be delivered in the country. Over four years on, the company now owns 10 Komatsu iMC machines across both excavators and dozers, and significantly, its fleet was further expanded when they recently became the first Polish customer to take delivery of an iMC 2.0 version of the PC210LCi-11
  • Caterpillar has a Vision that includes total project site overview
    April 5, 2016
    Caterpillar may be on its financial back foot, but a recent event showed the company has a vision far beyond this or the next financial year – David Arminas reports. Many construction machinery manufacturers have some data collection and analysis systems for their heavy equipment. For a good decade, manufacturers have been moving in this direction, first as retrofit packages on machines in the field and increasingly as standard on newer models. Caterpillar is no exception among manufacturers that are movin