Skip to main content

Simex upgrades ART 1000 cold in-situ recycling attachment to ride a wave of road repairs projects around the world

April 10, 2025 Read time: 3 mins
The next generation of ART 1000 will allow tighter control of cold in-situ recycling of asphalt roads

Simex has launched the next generation of its ART 1000 attachment for in-situ cold recycling of asphalt roads. ART 1000 – GEN II benefits from upgrades to its on-board electronics to provide more information to the operator, the addition of a Wi-Fi transmitter for remote monitoring, and some small design changes to make maintenance easier.

First launched in 2022, Simex developed the ART 1000 to rejuvenate deteriorated roads, without the need for additional material or heating. As well as milling and crushing the road surface, the system adds a rejuvenator to the milled material to restore some of the properties of the aged bitumen in the asphalt – and returns it to the road for compacting.

“With a small investment, the ART allows the life of a road to be extended without having to bring in new material for resurfacing, or the need to take any material away,” says Federico Tamburri, key account manager at Simex.  

With secondary and country roads in many European countries in poor repair, Simex is in discussions with a major excavator manufacturer who sees its potential.  

The ART 1000 works by first milling material from the road, up to a depth of 100mm. It is mixed in the milling drum with a calculated amount of rejuvenator. In a second drum the material is crushed to the correct size before being returned to the road. A final phase sees the attachment run over the material on the road to give it a final mixing before it can be compacted with a roller.

The latest generation includes a new video interface which displays real-time information such as linear metres completed, additive dosage and total additive consumption – which is also compiled into an end-of-day report. Simex software adjusts the dosage of the additive according to the speed of advancement, with a series of LED lights which indicate when the ideal speed of travel has been reached.

Simex has also made changes to the 100-litre additive tank so that it is easily removable and allows access to the crusher drum for cleaning. The grille in the crusher drum that determines particle size is also now easily removable for cleaning.

To work in tandem with the ART 1000, Simex has also created the ST-ART 200 mini dozer, to spread the rejuvenated material.  “We found that with the ART, several people were required to shovel the rejuvenated material into the right channel before it is compacted,” explained Tamburri. “This mini tracked dozer can be used to spread the material around.”

The ST-ART 200 also has two tanks: a 170-litre tank which holds back-up rejuvenator for the ART and a 200-litre tank for emulsion which can be sprayed onto the road to seal it at the end of the process. 

For more information on companies in this article

Related Content

  • Kleemann premieres MOBISCREEN MSS 1102 PRO
    May 16, 2025

    Kleemann’s new MOBISCREEN MSS 1102 PRO scalping screen is now coming to market, in addition to the firm’s new mobile impact crusher and proven SPECTIVE CONNECT operating concept.

  • Germany’s B-85 gets the treatment from Bomag’s BM 2200/75 planer
    February 23, 2018
    By this spring, Bomag’s new BM 2200/75 cold planer will have removed all the old pavement from a 2.6km section of Germany’s federal highway B-85. Work on the section between Amberg and Pittersberg started at the end of 2016 after the Ministry of Transport classified the road as being in “urgent need” of upgrading as part of the Federal Transport Infrastructure Plan. Actual roadworks began in mid-June 2017 after essential forestry work had been carried out, such as the removal of tree roots on both sides
  • Multiple milling machines removing surface
    April 24, 2019
    Milling subcontractor Pavement Recycling Systems removed thousands of tonnes of reclaimed asphalt pavement (RAP) from a runway at Oakland International Airport in California recently. The firm used a fleet of six Wirtgen W 210i cold milling machines to remove the asphalt in less than 60 hours from Runway 12-30, along the shore of San Francisco Bay. In total, 47,000tons of asphalt were milled within a 60-hour time frame, nonstop day and night, plus a single-shift second phase a week later. The firm start
  • Asphalt plants: alternative fuels on the horizon
    November 22, 2022
    Many asphalt plant manufacturers such as Ammann, Benninghoven and Fayat have already developed contingencies for alternative fuels.