Skip to main content

Simex upgrades ART 1000 cold in-situ recycling attachment to ride a wave of road repairs projects around the world

April 10, 2025 Read time: 3 mins
The next generation of ART 1000 will allow tighter control of cold in-situ recycling of asphalt roads

Simex has launched the next generation of its ART 1000 attachment for in-situ cold recycling of asphalt roads. ART 1000 – GEN II benefits from upgrades to its on-board electronics to provide more information to the operator, the addition of a Wi-Fi transmitter for remote monitoring, and some small design changes to make maintenance easier.

First launched in 2022, Simex developed the ART 1000 to rejuvenate deteriorated roads, without the need for additional material or heating. As well as milling and crushing the road surface, the system adds a rejuvenator to the milled material to restore some of the properties of the aged bitumen in the asphalt – and returns it to the road for compacting.

“With a small investment, the ART allows the life of a road to be extended without having to bring in new material for resurfacing, or the need to take any material away,” says Federico Tamburri, key account manager at Simex.  

With secondary and country roads in many European countries in poor repair, Simex is in discussions with a major excavator manufacturer who sees its potential.  

The ART 1000 works by first milling material from the road, up to a depth of 100mm. It is mixed in the milling drum with a calculated amount of rejuvenator. In a second drum the material is crushed to the correct size before being returned to the road. A final phase sees the attachment run over the material on the road to give it a final mixing before it can be compacted with a roller.

The latest generation includes a new video interface which displays real-time information such as linear metres completed, additive dosage and total additive consumption – which is also compiled into an end-of-day report. Simex software adjusts the dosage of the additive according to the speed of advancement, with a series of LED lights which indicate when the ideal speed of travel has been reached.

Simex has also made changes to the 100-litre additive tank so that it is easily removable and allows access to the crusher drum for cleaning. The grille in the crusher drum that determines particle size is also now easily removable for cleaning.

To work in tandem with the ART 1000, Simex has also created the ST-ART 200 mini dozer, to spread the rejuvenated material.  “We found that with the ART, several people were required to shovel the rejuvenated material into the right channel before it is compacted,” explained Tamburri. “This mini tracked dozer can be used to spread the material around.”

The ST-ART 200 also has two tanks: a 170-litre tank which holds back-up rejuvenator for the ART and a 200-litre tank for emulsion which can be sprayed onto the road to seal it at the end of the process. 

For more information on companies in this article

Related Content

  • Surfaces made safe
    April 4, 2012
    Spanning Manahawkin Bay, and carrying traffic along Route 72 between Long Beach Island and Manahawkin, New Jersey, USA, the Dorland J. Henderson Memorial Bridge, known as the Manahawkin Bay Bridge, was in need of repair. New Jersey Department of Transportation (NJDOT) specified Transpo T-17 MMA polymer concrete patch and T-18 MMA polymer concrete slurry overlay as approved materials for the 12,000m² bridge rehabilitation project on the steel girder bridge. All the bridge deck spalls were prepared and patche
  • Easy operating
    July 31, 2012
    Modern asphalt plants are a far cry from the early models, and are capable of producing a wide variety of mixes at the touch of a button. Patrick Smith reports Cutting-edge software-based control technology makes today's asphalt mixing plants simple and efficient to operate. The tightening of clean air regulations is reducing the emissions from the plants, and the current focus is on the goal of raising the processed portion of reclaimed asphalt (RA) towards 100%, says Ammann Group, which has been involved
  • Efficient asset management to trim maintenance budgets
    January 22, 2014
    Transport infrastructure is taken for granted in many, if not most, developed countries. This has resulted in a shortage of investment in maintenance, posing potential long term cost issues. In many developing nations transport networks are expanding fast, but insufficient thought is also being given to how these will be maintained.
  • Ammann up to the bridge
    November 9, 2023
    Compacting asphalt on a bridge is a difficult job as the roller operator needs to bring just the right amount of vibration.