Skip to main content

Sheffield duty for a Miller PowerLatch

The Miller PowerLatch Tilt was recently the attachment of choice for Yorkshire-based engineering consultancy JN Bentley, part of global engineering consultancy Mott MacDonald.
June 3, 2019 Read time: 2 mins
Miller PowerLatch Tilting Quick Hitch: a 180° tilt

The Miller PowerLatch Tilt was recently the attachment of choice for Yorkshire-based engineering consultancy JN 6197 Bentley, part of global engineering consultancy 2579 Mott MacDonald.

As part of the work to relocate waste treatment works in Stocksbridge, near Sheffield, England, Bentley laid new pipes along Manchester Road.

But space was restricted and the team looked at a different way to break out the rock. Using a 13T 2300 Komatsu PC138 excavator initially fitted with a standard quick hitch, the team started shearing the walls by hand. Due to the single-lane closure, the Komatsu had to stay central to the dig and, therefore, the team encountered challenges with breaking through rock in a restricted working area.

The team trialled a number of traditional and alternative methods, such as using a lightweight, remote controlled excavator with a breaker.

Then the team trialed a Miller PowerLatch Tilting Quick Hitch. It operates the same as a traditional automatic quick hitch, easily connecting buckets but with the added capability of 180° tilt.

The team could then use a breaker to shear the sides. This meant eliminating HAVS - hand-arm vibration syndrome - associated with breaking out by hand while being far more cost -effective compared to other methods. The tilt motion was also beneficial using the bucket to scrape the clay side walls.

“The PowerLatch Tilt provided a simple and flexible solution, allowing the team to angle the breaker to shear the sidewalls of the trench without the need to constantly reposition the machine,” said Andy Ball, Bentley’s plant manager. “It saved the team time, money and avoided the need for colleagues to work in the trench, exposing them to vibration/HAVS associated with traditional methods.” 

“Miller have managed to deliver the lightest tilt frame in the marketplace with the lowest profile to offer optimised breakout force whilst increasing strength in traditionally highly stressed areas,” said Brendan Quill, 6739 Miller UK’s marketing director.

“The top bolted attachment method removes a notoriously troublesome welded connection seen in a number of other tilt couplers available on the market.”  

 

For more information on companies in this article

Related Content

  • Extra bucket versatility with thumb tool
    September 6, 2019
    Solesbee’s, part of Kinshofer, is offering its series of manual and hydraulic excavator thumbs for any size and model excavator. The thumbs allow operators to move from one application to another, such as moving dirt or material, without changing attachments. This versatility is said to increase efficiency for a variety of applications, including land clearing, site preparation, demolition and recycling. Solesbee’s says that it engineers its thumbs with efficiency and safety in mind. The company work
  • Kuwait’s key causeway contract under construction
    July 4, 2016
    A new causeway, crossing the Bay of Kuwait, is under construction and providing a major engineering challenge - Mike Woof reports. The new Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project being built across the Bay of Kuwait is a massive engineering project that is costing around US$3 billion in all. This highly complex project involves the design, build, completion and maintenance of the causeway, which spans Kuwait Bay between Kuwait City and the Subiyah area. The 36km Sheikh Jaber Al-Ahmad Al-Sabah Cau
  • Hydraulic breakers key to Hyderabad road project
    April 10, 2012
    The new Hyderabad Outer Ring Road (ORR) project is a 158km eight-lane highway encircling the Andhra Pradesh city. It has been designed to relieve congestion in and around the city and to act as a hub for accessing India's national highway network, and is being built for the Hyderabad Metropolitan Development Authority. Indian contractor Ramky Infrastructure is relying on an Atlas Copco MB 1700 hydraulic breaker to break granite as aggregates at a quarry site adjacent to the new road. The rock is bein
  • Hydraulic breakers key to Hyderabad road project
    May 8, 2012
    The new Hyderabad Outer Ring Road (ORR) project is a 158km eight-lane highway encircling the Andhra Pradesh city. It has been designed to relieve congestion in and around the city and to act as a hub for accessing India's national highway network, and is being built for the Hyderabad Metropolitan Development Authority. Indian contractor Ramky Infrastructure is relying on an Atlas Copco MB 1700 hydraulic breaker to break granite as aggregates at a quarry site adjacent to the new road. The rock is bein