Skip to main content

Sennebogen builds its largest duty cycle crawler crane, the 6300

Sennebogen has begun production of a 300tonne duty cycle crawler crane, the 6300, in its home German state of Bavaria. Assembly of the first one - the largest ever Sennebogen duty cycle crawler crane - began in Straubing at the end of last year in an expanded production facility. “Every part has been designed for maximum durability,” said managing director Erich Sennebogen. “The base frame is solid steel to absorb forces during continuous use and we also spared no expense in high-quality, solid compo
March 14, 2016 Read time: 2 mins
Reach for the top, with Sennebogen’s 6300
2924 Sennebogen has begun production of a 300tonne duty cycle crawler crane, the 6300, in its home German state of Bavaria.

Assembly of the first one - the largest ever Sennebogen duty cycle crawler crane - began in Straubing at the end of last year in an expanded production facility.

“Every part has been designed for maximum durability,” said managing director Erich Sennebogen. “The base frame is solid steel to absorb forces during continuous use and we also spared no expense in high-quality, solid components.”

It measures an12m in length and the crawler tracks are 9.5m long, with a track width of 6.8m for stability and easy maneuverability.

The green upper-carriage and solid counterweight plates bring the machine’s weight of 310tonnes. The upper-carriage alone weighs around 100tonnes.

The machine’s extreme hydraulic power allows for demanding, dynamic use under extreme loads, for example in dredging, mining and special underground engineering operations. The modular concept opens up versatile variants, such as an 80m main boom available for use with lifting hooks.

The 6300 is also ideal as a drive unit for hydraulic attachments because of its hydraulic power of up to 350 bar, a 2,000-litre hydraulic tank and oversized hydraulic lines and valves.

For more information on companies in this article

Related Content

  • Versatile and efficient, Sennebogen’s new port crane offers high performance
    March 27, 2013
    Sennebogen’s 875 E-Series crane is said to offer a high materials handling capacity, with low energy requirements and operating costs. Efficiency has been increased due to a new energy recovery system. Various gantry or pylon solutions and variable cabin elevation features are available. This materials handling machine has an operating weight of up to 150tonnes and is suited for port handling and industrial applications. A newly developed energy recovery cylinder is being implemented for the first time. The
  • Sennebogen is offering a large and powerful telescopic crawler crane
    January 6, 2017
    The new 673 telescopic crawler crane from Sennebogen is said to be powerful, efficient and stable in operation. The machine offers a lifting capacity of 70tonnes crane while its telescoping boom is said to maximise versatility for an array of lifting applications. The new 673 R-HD is said to be rugged and durable and is the first telescopic crawler crane in the firm’s new E-series. Key features include stability and ease of transport, as well as fast set-up times. For on-road transport the crane is less tha
  • Sennebogen is offering a large and powerful telescopic crawler crane
    March 27, 2013
    The new 673 telescopic crawler crane from Sennebogen is said to be powerful, efficient and stable in operation. The machine offers a lifting capacity of 70tonnes crane while its telescoping boom is said to maximise versatility for an array of lifting applications. The new 673 R-HD is said to be rugged and durable and is the first telescopic crawler crane in the firm’s new E-series. Key features include stability and ease of transport, as well as fast set-up times. For on-road transport the crane is less tha
  • Sennebogen expanding manufacturing facilities
    September 24, 2015
    German firm Sennebogen is expanding its manufacturing facilities at its headquarters in Straubing in Bavaria. The firm is extending its production and warehouse areas at the site by around 35,000m². The company is also building a new 6,700m² production shop that will be used for the assembly and painting of large components and for finishing work and quality control. With this investment into the Straubing site located around one hour’s drive to the north of Munich, the company is preparing itself for futur