Skip to main content

Sennebogen builds its largest duty cycle crawler crane, the 6300

Sennebogen has begun production of a 300tonne duty cycle crawler crane, the 6300, in its home German state of Bavaria. Assembly of the first one - the largest ever Sennebogen duty cycle crawler crane - began in Straubing at the end of last year in an expanded production facility. “Every part has been designed for maximum durability,” said managing director Erich Sennebogen. “The base frame is solid steel to absorb forces during continuous use and we also spared no expense in high-quality, solid compo
March 14, 2016 Read time: 2 mins
Reach for the top, with Sennebogen’s 6300
2924 Sennebogen has begun production of a 300tonne duty cycle crawler crane, the 6300, in its home German state of Bavaria.

Assembly of the first one - the largest ever Sennebogen duty cycle crawler crane - began in Straubing at the end of last year in an expanded production facility.

“Every part has been designed for maximum durability,” said managing director Erich Sennebogen. “The base frame is solid steel to absorb forces during continuous use and we also spared no expense in high-quality, solid components.”

It measures an12m in length and the crawler tracks are 9.5m long, with a track width of 6.8m for stability and easy maneuverability.

The green upper-carriage and solid counterweight plates bring the machine’s weight of 310tonnes. The upper-carriage alone weighs around 100tonnes.

The machine’s extreme hydraulic power allows for demanding, dynamic use under extreme loads, for example in dredging, mining and special underground engineering operations. The modular concept opens up versatile variants, such as an 80m main boom available for use with lifting hooks.

The 6300 is also ideal as a drive unit for hydraulic attachments because of its hydraulic power of up to 350 bar, a 2,000-litre hydraulic tank and oversized hydraulic lines and valves.

For more information on companies in this article

Related Content

  • New Holland’s Generation B
    February 18, 2013
    Ranging from 15 to 19tonnes, New Holland has launched its new B Series PRO generation of wheeled excavators. Boasting brand new controls, the three new models are said to excel in high precision work, while also being remarkably easy to operate and service. The B Series PRO wheeled excavators run high performance, large displacement FPT engines delivering high torque and power. This performance is said to be matched by that of the 3-pump hydraulic system, which maximises swing performance with a dedicated s
  • New Holland’s Generation B
    February 18, 2013
    Ranging from 15 to 19tonnes, New Holland has launched its new B Series PRO generation of wheeled excavators. Boasting brand new controls, the three new models are said to excel in high precision work, while also being remarkably easy to operate and service. The B Series PRO wheeled excavators run high performance, large displacement FPT engines delivering high torque and power. This performance is said to be matched by that of the 3-pump hydraulic system, which maximises swing performance with a dedicated s
  • Innovative solutions to earthmoving needs
    January 3, 2013
    Several manufacturers are offering improved earthmoving machines, with more to come - Mike Woof reports. One of the most notable developments comes from Caterpillar, with the unveiling of a hybrid excavator in the shape of its 336E H model. The machine is having its public launch at the bauma exhibition in Spring 2013 and will start rolling out of the factory in March 2013, while customers will be able to place orders from February 2013. Unlike other hybrid excavators on the market at present, the Cat 336E
  • Peri formwork for Danish port link tunnel project
    November 29, 2013
    The Nordhavnsvej – Vej- og Tunnelentreprise (Nordhavnsvej) project is Copenhagen’s largest infrastructure project in the last 50 years. The 1.65km-long route will eventually link the Danish capital’s northern port area with the Helsingør motorway. It runs through a very densely built urban area, in parts at depths of up to 22m. One particular challenge regarding the execution was planning the course of the tunnel because the underground structure also crosses a very busy railway line.