Skip to main content

Sennebogen builds its largest duty cycle crawler crane, the 6300

Sennebogen has begun production of a 300tonne duty cycle crawler crane, the 6300, in its home German state of Bavaria. Assembly of the first one - the largest ever Sennebogen duty cycle crawler crane - began in Straubing at the end of last year in an expanded production facility. “Every part has been designed for maximum durability,” said managing director Erich Sennebogen. “The base frame is solid steel to absorb forces during continuous use and we also spared no expense in high-quality, solid compo
March 14, 2016 Read time: 2 mins
Reach for the top, with Sennebogen’s 6300
2924 Sennebogen has begun production of a 300tonne duty cycle crawler crane, the 6300, in its home German state of Bavaria.

Assembly of the first one - the largest ever Sennebogen duty cycle crawler crane - began in Straubing at the end of last year in an expanded production facility.

“Every part has been designed for maximum durability,” said managing director Erich Sennebogen. “The base frame is solid steel to absorb forces during continuous use and we also spared no expense in high-quality, solid components.”

It measures an12m in length and the crawler tracks are 9.5m long, with a track width of 6.8m for stability and easy maneuverability.

The green upper-carriage and solid counterweight plates bring the machine’s weight of 310tonnes. The upper-carriage alone weighs around 100tonnes.

The machine’s extreme hydraulic power allows for demanding, dynamic use under extreme loads, for example in dredging, mining and special underground engineering operations. The modular concept opens up versatile variants, such as an 80m main boom available for use with lifting hooks.

The 6300 is also ideal as a drive unit for hydraulic attachments because of its hydraulic power of up to 350 bar, a 2,000-litre hydraulic tank and oversized hydraulic lines and valves.

For more information on companies in this article

Related Content

  • Toggenburger takes two Terex cranes to tackle a Swiss tandem lift
    August 21, 2015
    Two of the largest cranes in Switzerland recently were called upon to lift an 884tonne, 162m-long connecting bridge between two buildings at the Coop distribution centre in Schafisheim. “The individual bridge components had enormous gross weights of up to 275tonnes and required us to use working radii of up to 29m,” said Andre Huber, project manager at Toggenburger, the company that took on the task. To get the job done, Toggenburger rolled out its biggest machinery which also happen to be the two lar
  • Praise for high production crawler crane
    April 16, 2012
    Sennebogen's 6130 HD duty cycle crawler crane has received praise for its mining work in central Germany. The machine, which comes with drag shovel and a 5.6m³ dragline, has been extracting 2,500m³ of gravel/day. The crawler crane's 29.9m boom is used to pour material over a large heap before it is sieved after a short drying period and transported on with a HGV. The Sennebogen 6130 is being used by construction company Himmel und Papesch on behalf of K+B Kies und Beton. Himmel und Papesch says the machine
  • Bridge demolition easier with modern machines
    February 23, 2012
    The speedy and safe removal of old or unwanted structures is made easier with modern, sophisticated equipment, Patrick Smith reports. The power and versatility of modern demolition tools and machines was demonstrated when a bridge was removed overnight as part of a motorway widening project.
  • Case unveils D Series crawler excavators
    February 5, 2015
    Ranging from 25-40 tonnes, Case Construction Equipment is unveiling its four new generation D Series crawler excavators. The quartet of new models – CX250D, CX300D, CX350D, and CX370D - have Tier 4 Final (Stage IV) engines and boast new features and upgrades said to raise the bar on the performance of CX excavators.