Skip to main content

The searchers

When a traffic policeman went missing in the Czech Republic his superiors quickly became concerned and started an intensive search for the man. A media campaign resulted in his photo being used in the press and also on TV, along with appeals for any information about his whereabouts.
April 11, 2013 Read time: 1 min
When a traffic policeman went missing in the Czech Republic his superiors quickly became concerned and started an intensive search for the man. A media campaign resulted in his photo being used in the press and also on TV, along with appeals for any information about his whereabouts. Soon after the campaign commenced, he was spotted drinking in a bar in the city of Brno and it transpired he had been on a week-long drinking binge. His employers were understandably somewhat less than happy and the traffic policeman may have grounds to regret his over-appreciation of the Czech Republic’s fine quality beers.

Related Content

  • Noise mapping using Dynamic Search
    March 1, 2012
    Braunstein + Berndt has released a new SoundPLAN version, SoundPLAN 7.0, and a main feature of this is the new calculation core employing the Dynamic Search scanning method. This, according to the company, makes it possible to calculate anything, no matter how complex the geometry and no matter what size the project.
  • CECE Summit – is Europe ready for a digital construction worksite?
    November 20, 2015
    The CECE has voiced his concern over government regulations that could strangle innovation for the digitalisation of construction machinery. China’s imploding economy was another topic at the recent conference in Brussels, reports David Arminas. The CECE has urged the European Parliament and European Commission to enact legislation that promotes rather than hinders the construction sector’s transition to a digitalised way of working. “We need a smart regulatory framework that helps to unlock the full poten
  • IBT goes roundabout in Bradenton, Florida
    November 26, 2019
    Another roundabout is being built in the US where the public remains sceptical but agencies and contractors are on board, writes David Armina
  • Airport runway rebuild at Bologna
    May 15, 2019
    Rebuilding a runway requires special attention to detail to maximise efficiency and safety Airport runways face special challenges with regard to the loads they carry on a daily basis, particularly when aircraft are landing. A modern jet aircraft will typically land at speeds of around 240-260km/h, with a laden 747 weighing as much as 265tonnes at the end of a long flight. The stresses these large aircraft place on runway surfaces are enormous and not just with the massive impact forces exerted during