Skip to main content

Scheduling efficiently with B2W

Sophisticated software from B2W is said to help ensure efficient logistics operations for construction sites by providing comprehensive trucking management capabilities.
July 20, 2020 Read time: 2 mins
According to the firm, contractors that use B2W Track for field tracking and analysis can create or modify daily field logs directly from information provided by the B2W scheduling and dispatching application

Using this package, contractors can now schedule and dispatch trucking along with employees, equipment and materials using a centralised, online platform from B2W according to the firm.

New capabilities are being offered within the B2W Schedule application to assist contractors in managing trucking orders and assignments with online visibility and real-time agility.

Schedulers and dispatchers can assign, view and modify truck requirements and deliveries being fulfilled by their own fleets and by outside, third-party contractors.

The firm says that the package provides a centralised view of resource needs and assignments, equipment moves, material orders and trucking requirements. Users access the system from desktop, laptop or mobile tablet devices and can customise one-day, multi-day or multi-week views according to their roles. Specific users can create and modify assignments based on permission levels.

Move Planner and Mass Haul Planner modules within B2W Schedule are used to manage equipment moves and mass haul schedules more efficiently. Notifications about these trucking assignments, including revisions to a schedule, can be communicated to drivers via text message or email.

B2W Schedule also assists in identifying and resolving scheduling conflicts and includes a Map View that uses GPS and telematics data to validate the location of resources.

The scheduling and dispatching application is part of B2W Software’s ONE Platform, which also includes capabilities for heavy construction field tracking and analysis and equipment maintenance as well as estimating, safety, e-forms and reporting.

Similarly, information on the status and availability of assets from the B2W Maintain application for equipment maintenance can be accessed in real time in B2W Schedule.

For more information on companies in this article

Related Content

  • The paperless construction site
    August 9, 2019
    Digitalization is changing the construction industry faster than expected. Automation, additional sensors and the networking of machines make it possible to exploit optimization potential and noticeably increase productivity. However, despite innovative working methods and digitization, the road construction process is still mainly based on one medium: paper. Paper can be used for a wide variety of purposes and offers unlimited flexibility. Construction schedules, work schedules, work sheets, mix orders
  • Machine control technology evolving fast
    February 8, 2012
    The machine control market is evolving fast and is increasingly becoming part of a much wider construction site management concept, Mike Woof reports. Machine control technology has come a long way in the past 20 years and the development of 2D and 3D systems has been rapid in the construction sector.
  • Navman Wireless wins award
    April 30, 2012
    Navman Wireless’ Qtanium 300 GPS construction fleet tracking system has won a 2011 Chicago Innovation Award set up to recognise the most innovative new products and services introduced by Chicago-area companies. The Qtanium 300 is claimed to be the first universal construction fleet tracking system, making it possible to monitor actual equipment usage and associated costs for all makes and models of construction equipment from a single application. As part of the company's flagship OnlineAVL2 fleet tracking
  • Yotta and PiP IoT improve safety on Auckland motorways
    February 25, 2020
    In New Zealand, Auckland System Management is working with asset software provider Yotta and sensor manufacturer PiP IoT to manage motorway maintenance and repairs.