Skip to main content

Scheduling efficiently with B2W

Sophisticated software from B2W is said to help ensure efficient logistics operations for construction sites by providing comprehensive trucking management capabilities.
July 20, 2020 Read time: 2 mins
According to the firm, contractors that use B2W Track for field tracking and analysis can create or modify daily field logs directly from information provided by the B2W scheduling and dispatching application

Using this package, contractors can now schedule and dispatch trucking along with employees, equipment and materials using a centralised, online platform from B2W according to the firm.

New capabilities are being offered within the B2W Schedule application to assist contractors in managing trucking orders and assignments with online visibility and real-time agility.

Schedulers and dispatchers can assign, view and modify truck requirements and deliveries being fulfilled by their own fleets and by outside, third-party contractors.

The firm says that the package provides a centralised view of resource needs and assignments, equipment moves, material orders and trucking requirements. Users access the system from desktop, laptop or mobile tablet devices and can customise one-day, multi-day or multi-week views according to their roles. Specific users can create and modify assignments based on permission levels.

Move Planner and Mass Haul Planner modules within B2W Schedule are used to manage equipment moves and mass haul schedules more efficiently. Notifications about these trucking assignments, including revisions to a schedule, can be communicated to drivers via text message or email.

B2W Schedule also assists in identifying and resolving scheduling conflicts and includes a Map View that uses GPS and telematics data to validate the location of resources.

The scheduling and dispatching application is part of B2W Software’s ONE Platform, which also includes capabilities for heavy construction field tracking and analysis and equipment maintenance as well as estimating, safety, e-forms and reporting.

Similarly, information on the status and availability of assets from the B2W Maintain application for equipment maintenance can be accessed in real time in B2W Schedule.

For more information on companies in this article

Related Content

  • Efficient asset management delivers
    April 25, 2013
    Maximising the economic benefit of infrastructure assets can be achieved through delivering better quality maintenance. Increasing utilisation of infrastructure follows on from those assets being in better condition. Clearly by tracking infrastructure condition closely, huge gains can be made in addressing technical issues before they become more serious and more costly, as well as minimising disruption. In UK city Birmingham, high resolution aerial photography from Bluesky is helping the city council under
  • Data handling for efficient machine control
    October 16, 2012
    The rapid increase in information availability is transforming the construction sector. Conventional methods used for sourcing geographic data based on maps and localised sampling meant that there was often a lack of accurate information relating to ground conditions at specific areas where work was planned, often resulting in unwelcome surprises for construction companies along with additional costs for projects.
  • Improved construction software from Topcon
    June 22, 2021
    Topcon Positioning is introducing the latest version of its software package for construction and survey professionals: MAGNET 7.
  • The use of telematics in construction machines is growing
    May 20, 2015
    Demand for telematics technology is growing, as equipment users begin to lean the value of these systems – Alan Dron reports With construction projects increasingly operating to wafer-thin profit margins, any technological assistance that can keep the accounts in the black is welcome. This is particularly the case with those projects where contractors can share a larger slice of the profits if they complete their work ahead of schedule. The downside, of course, is that they also share the pain if the