Skip to main content

Scheduling efficiently with B2W

Sophisticated software from B2W is said to help ensure efficient logistics operations for construction sites by providing comprehensive trucking management capabilities.
July 20, 2020 Read time: 2 mins
According to the firm, contractors that use B2W Track for field tracking and analysis can create or modify daily field logs directly from information provided by the B2W scheduling and dispatching application

Using this package, contractors can now schedule and dispatch trucking along with employees, equipment and materials using a centralised, online platform from B2W according to the firm.

New capabilities are being offered within the B2W Schedule application to assist contractors in managing trucking orders and assignments with online visibility and real-time agility.

Schedulers and dispatchers can assign, view and modify truck requirements and deliveries being fulfilled by their own fleets and by outside, third-party contractors.

The firm says that the package provides a centralised view of resource needs and assignments, equipment moves, material orders and trucking requirements. Users access the system from desktop, laptop or mobile tablet devices and can customise one-day, multi-day or multi-week views according to their roles. Specific users can create and modify assignments based on permission levels.

Move Planner and Mass Haul Planner modules within B2W Schedule are used to manage equipment moves and mass haul schedules more efficiently. Notifications about these trucking assignments, including revisions to a schedule, can be communicated to drivers via text message or email.

B2W Schedule also assists in identifying and resolving scheduling conflicts and includes a Map View that uses GPS and telematics data to validate the location of resources.

The scheduling and dispatching application is part of B2W Software’s ONE Platform, which also includes capabilities for heavy construction field tracking and analysis and equipment maintenance as well as estimating, safety, e-forms and reporting.

Similarly, information on the status and availability of assets from the B2W Maintain application for equipment maintenance can be accessed in real time in B2W Schedule.

For more information on companies in this article

Related Content

  • Sophisticated plotting
    February 7, 2012
    Leica Geosystems is offering its improved SpiderWeb v4.0 package as part of the new reference station software update. This improved suite of solutions also includes the GNSS Spider v4.0 and SpiderQC v4.0 packages.
  • Leica Geosystems introduces smart monitoring of structures
    October 1, 2014
    Highly sophisticated, the Leica GeoMoS Now! From Leica Geosystems is a new web-based application enables on-the-go visualisation and analysis of structural and ground movement monitoring data. With this package, large quantities of geodetic and geotechnical data are said to be easier to handle with simplified workflows using automatic configuration and distribution tools. The package can quickly notify users of any changes in data for faster, more informed responses. Leica GeoMoS Now! allows users t
  • Heijmans’ bright yellow Dynapacs get the green light at Schiphol
    August 5, 2016
    A damp and foggy morning at Amsterdam’s Schiphol Airport in the Netherlands. Some of the five runways are in normal use, but one of them shows a different kind of activity. At a slow but steady pace, a small army of bright yellow machines is repaving the surface. The project is being carried out by Heijmans, one of the largest road-building contractors in the Netherlands.
  • A virtual virtuous circle
    January 18, 2021
    Virtual sensors will allow a safer driving experience and reduce road maintenance costs. Tactile Mobility’s Eitan Grosbard talks to David Arminas