Skip to main content

SBM’s new generation vertical impact crusher rotor

SBM has introduced a new generation of vertical impact crusher rotors. The company says that the vertical impact crusher type V8 as well as the bigger model V10 can easily be upgraded by the new rotor. “Due to mounting protective cast armour plates at the upper and lower sides of the rotor, the service life of the rotor body could be prolonged by three times minimum in comparison to the old version. Repair costs are also considerably lower as maintenance has become easier and quicker,” says SBM. The newl
March 15, 2016 Read time: 1 min
7156 SBM Mineral Processing has introduced a new generation of vertical impact crusher rotors.

The company says that the vertical impact crusher type V8 as well as the bigger model V10 can easily be upgraded by the new rotor.

“Due to mounting protective cast armour plates at the upper and lower sides of the rotor, the service life of the rotor body could be prolonged by three times minimum in comparison to the old version. Repair costs are also considerably lower as maintenance has become easier and quicker,” says SBM.

The newly-developed cast armour plates make it much easier for operating staff to clearly see the state of wear, and wear parts can be changed even when the rotor is mounted as the cast armour plates can be exchanged in sections.

For more information on companies in this article

Related Content

  • New C10DX and C12DX join Haulotte’s INTERMAT 2012 line-up
    February 3, 2012
    Haulotte Group will be showing its full range of telehandlers including the new generation of its 10tonne and 12tonne rough-terrain scissor lifts, which will be launched at INTERMAT.
  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • New barriers are helping improve road safety
    June 30, 2014
    A series of new guardrail technologies and barrier developments are now coming to market - Mike Woof writes. An array of technical developments is helping improve highway safety for road users. New barrier and guardrail technologies can offer greater conspicuity so as to alert drivers, along with better restraint capabilities. Gregory Industries offers a wide range of steel and cable barrier types and has now developed an attachment system for international use. This fixes the guardrail to the post and in t