Skip to main content

Satellites for site safety

Mobexx is offering a satellite communications capability for its Mentor Ranger in-vehicle computer intended to improve lone worker safety. The system switches automatically between cellular and satellite networks depending on the available coverage. This package is said to maximise connectivity between site personnel and the office, providing improved monitoring and communication whenever they are operating in high risk situations or isolated sites. The new satellite interface allows the Work Alone system t
February 10, 2012 Read time: 2 mins
Remote worker safety is improved according to Mobexx when using its latest system
2554 Mobexx is offering a satellite communications capability for its Mentor Ranger in-vehicle computer intended to improve lone worker safety. The system switches automatically between cellular and satellite networks depending on the available coverage. This package is said to maximise connectivity between site personnel and the office, providing improved monitoring and communication whenever they are operating in high risk situations or isolated sites. The new satellite interface allows the Work Alone system to operate in either cellular or satellite mode. The system uses the global Iridium satellite network. Companies can use the Work-Alone system for live monitoring of mobile engineers and their vehicles on computer screen. This gives information for each vehicle and a countdown to the engineer's next update. Mobile staff wear a pendant to check-in to the system and click a button to activate the package, which triggers a countdown to the next required status update. If an engineer misses a check-in, the system creates an automatic alert, which highlights the vehicle on the office computer screen. Alerts are also created by pressing the pendant's panic button or if the pendant is motionless for a preset time. The system can also provide automatic email alerts of the missed check-in or panic event to managers.

For more information on companies in this article

Related Content

  • Trimble's ruggedised tablet for site use
    May 15, 2019
    Trimble is now offering its T7 Tablet, a rugged, lightweight and versatile device for construction surveying applications. The unit features the Trimble Siteworks Software for construction surveying, allowing it to provide real-time data to visualise cut/fill levels, calculate material volumes, check grade and communicate work orders. This can allow users to to improve productivity and decision-making. Scott Crozier, general manager for Trimble’s Civil Engineering and Construction Division said, “Surveyors
  • Increased performance from Komatsu’s new WA500 wheeled loader
    January 6, 2017
    Komatsu says that its new WA500-7 wheel loader offers improved efficiency and lower fuel consumption, as well as increased output. Weighing in at 333tonnes, the WA500-7 has improved operator comfort with a larger and more spacious cab fitted with ergonomic controls and offering better visibility.
  • Efficient construction management with B2W
    July 3, 2019
    The firm is introducing an updated version of B2W Schedule with new capabilities for scheduling, dispatching and tracking construction materials. It is also offering significant field log user experience upgrades to B2W Track, the company’s field tracking and analysis software. In addition, the firm has a new B2W Inform app, which allows contractors to use the B2W forms and reporting solution without internet connectivity. B2W CEO and founder Paul McKeon said, “We completed important updates across our
  • New soil compactor launches from key manufacturers
    May 30, 2013
    Major manufacturers continue to develop new soil compactor models - Mike Woof reports. Innovations in machine design are being seen in the soil compaction sector from a number of major firms. As in other equipment sectors, new engine emissions legislation has played a huge role in driving the latest design changes. Europe, the US and Japan are rolling in the new Tier 4 Final/Stage IV legislation on noise and exhaust emissions which will be phased in across power output classes from the start of January 2014