Skip to main content

Sandvik’s RH460 hammer hits home

Swedish company Nibu Borr is using one of the newest developments in rock drills from Sandvik Construction, the RH460 hammer. This is the latest member of the down-the-hole range which continues Sandvik’s extensive portfolio of rock tools. Nibu Borr is focused on water well and energy drilling along with drilling for piles and reinforcements on construction projects. "You never really know what you’re going to encounter until you start drilling,” says Daniel Knutsson, head of drilling activities for Nibu
August 21, 2015 Read time: 1 min
Down the hatch with Sandvik’s down-the-hole hammer
Swedish company Nibu Borr is using one of the newest developments in rock drills from 2403 Sandvik Construction, the RH460 hammer.

This is the latest member of the down-the-hole range which continues Sandvik’s extensive portfolio of rock tools. Nibu Borr is focused on water well and energy drilling along with drilling for piles and reinforcements on construction projects. "You never really know what you’re going to encounter until you start drilling,” says Daniel Knutsson, head of drilling activities for Nibu, based in Stockholm and Gävle.

The Sandvik RH460 series come in 4” (10.16cm), 5” (12.7cm), 6” (15.24cm) and 8” (20.32cm), with all versions being designed to use bits with generic shank types. The 5”, 6” and 8” hammers are also available in heavy duty versions.

For more information on companies in this article

Related Content

  • A vision of roads
    September 3, 2012
    By 2040 European roads could be built differently, and hopefully be safer, according to the EU research programme NR2C
  • New Penang Bridge takes shape
    April 10, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • New Penang Bridge takes shape
    May 9, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • Caterpillar’s senior executives outline the group’s drive for greater overall efficiency
    January 6, 2017
    Caterpillar senior executives Edward Rapp and David Bozeman have pinpointed “systems integration” as one of the equipment giant’s future targets. Speaking at Conexpo 2014 this week, Edward Rapp, Caterpillar group president said that the introduction of Tier 4 Final engine technology has been a landmark moment for Caterpillar but added that emissions systems are not the answer in themselves to improved performance. “The secret sauce is not the Tier 4, it’s the systems integration” said Rapp.