Skip to main content

Sandvik’s RH460 hammer hits home

Swedish company Nibu Borr is using one of the newest developments in rock drills from Sandvik Construction, the RH460 hammer. This is the latest member of the down-the-hole range which continues Sandvik’s extensive portfolio of rock tools. Nibu Borr is focused on water well and energy drilling along with drilling for piles and reinforcements on construction projects. "You never really know what you’re going to encounter until you start drilling,” says Daniel Knutsson, head of drilling activities for Nibu
August 21, 2015 Read time: 1 min
Down the hatch with Sandvik’s down-the-hole hammer
Swedish company Nibu Borr is using one of the newest developments in rock drills from 2403 Sandvik Construction, the RH460 hammer.

This is the latest member of the down-the-hole range which continues Sandvik’s extensive portfolio of rock tools. Nibu Borr is focused on water well and energy drilling along with drilling for piles and reinforcements on construction projects. "You never really know what you’re going to encounter until you start drilling,” says Daniel Knutsson, head of drilling activities for Nibu, based in Stockholm and Gävle.

The Sandvik RH460 series come in 4” (10.16cm), 5” (12.7cm), 6” (15.24cm) and 8” (20.32cm), with all versions being designed to use bits with generic shank types. The 5”, 6” and 8” hammers are also available in heavy duty versions.

For more information on companies in this article

Related Content

  • Get paid faster for your work by being efficient, optimised, and careful with resources… get connected now
    September 1, 2023
    In this, the third roundtable meeting in World Highways’ series of Connected Construction discussions, Guy Woodford discusses the implications of developments in artificial intelligence (AI) and machine control with world-class experts in their field. Find out what Elwyn McLachlan, vice president of Civil Solutions at Trimble, Murray Lodge, senior vice president and general manager of Construction at Topcon Positioning Group, and Magnus Thibblin, vice president Heavy Construction at Hexagon Geosystems have to say about how you should be positioning your company for a successful future.
  • Fast flyover removal with specialist demolition equipment
    July 12, 2012
    An overcrowded Indian flyover was removed in record time using specialist demolition equipment, as Patrick Smith reports Demolition of the landmark Lalbaug flyover south of central Mumbai has been completed and work on a new bigger bridge has started in India's largest city. Although the 38-year-old Sant Dnyaneshwar (Lalbaug flyover) two-lane, one-way traffic artery was serviceable and used by to 15,000 vehicles/hour, there were daily traffic jams and environmental consequences. Despite the complex and dema
  • Innovation in road design and management software
    February 17, 2012
    The emphasis on data processing and re-use, continues to grow in the development of design and management software. The interoperability of software, the need to handle and process larger amounts of data, and re-use and retention of data sets from one task to another have been a growing emphasis in the past few years. It allows infrastructure companies to get better value from expensively collected information and to focus more on the whole life cycle of projects.
  • India’s longest road tunnel continues apace with Atlas Copco support
    May 20, 2014
    The challenging construction of India’s largest road tunnel is part of a vital US$500 million project aiming to connect the isolated northern state of Jammu and Kashmir with the rest of the vast and highly populated country. Guy Woodford reports Travelling on National Highway 1A (NH 1A) in northern India should be the dictionary definition of ordeal. The single lane, narrow and winding road crosses some of the steepest, most treacherous terrain on the planet. The arduous route becomes especially difficult t