Skip to main content

Sandvik’s RH460 hammer hits home

Swedish company Nibu Borr is using one of the newest developments in rock drills from Sandvik Construction, the RH460 hammer. This is the latest member of the down-the-hole range which continues Sandvik’s extensive portfolio of rock tools. Nibu Borr is focused on water well and energy drilling along with drilling for piles and reinforcements on construction projects. "You never really know what you’re going to encounter until you start drilling,” says Daniel Knutsson, head of drilling activities for Nibu
August 21, 2015 Read time: 1 min
Down the hatch with Sandvik’s down-the-hole hammer
Swedish company Nibu Borr is using one of the newest developments in rock drills from 2403 Sandvik Construction, the RH460 hammer.

This is the latest member of the down-the-hole range which continues Sandvik’s extensive portfolio of rock tools. Nibu Borr is focused on water well and energy drilling along with drilling for piles and reinforcements on construction projects. "You never really know what you’re going to encounter until you start drilling,” says Daniel Knutsson, head of drilling activities for Nibu, based in Stockholm and Gävle.

The Sandvik RH460 series come in 4” (10.16cm), 5” (12.7cm), 6” (15.24cm) and 8” (20.32cm), with all versions being designed to use bits with generic shank types. The 5”, 6” and 8” hammers are also available in heavy duty versions.

For more information on companies in this article

Related Content

  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot
  • New tunnel Acapulco Bay in Mexico
    May 25, 2016
    Acapulco is to benefit from a new tunnel route to cut congestion. A new road tunnel close to Acapulco Bay will help cut journey times for drivers in this part of Mexico. Both tourists and locals in Acapulco Bay currently experience long journey times at present, with a key problem being congestion on the 12km route from Juan N Alvarez International Airport to the Acapulco Bay beaches. During peak traffic times the journey along the scenic, winding road around the tip of the Cumbres de Llano Largo Mountain t
  • Sandvik’s new Asian models
    January 6, 2017
    At bauma China, Sandvik is revealing new additions to its product ranges that have been developed specifically for the requirements of the Asian market. The firm has seen strong demand for its products in Asia, with particularly rapid growth in China. Sandvik Construction has developed product lines that are aimed specifically at Asian market requirements. Asian customers are keen to use advanced, high-quality equipment and the latest Sandvik models for this territory offer high performance and reliability
  • Sandvik’s new Asian models
    November 20, 2012
    At bauma China, Sandvik is revealing new additions to its product ranges that have been developed specifically for the requirements of the Asian market. The firm has seen strong demand for its products in Asia, with particularly rapid growth in China. Sandvik Construction has developed product lines that are aimed specifically at Asian market requirements. Asian customers are keen to use advanced, high-quality equipment and the latest Sandvik models for this territory offer high performance and reliability