Skip to main content

Sandvik’s new DT912D jumbo offers intelligent drilling efficiency

Sandvik Construction is introducing what it says is a completely new tunneling jumbo, the DT912D, especially for limestone applications. The DT912D - a high reach, single boom jumbo - is completely self-contained. It is powered with a fuel-efficient and environmentally friendly Tier 4 Final diesel engine and equipped with onboard compressor and water tank for air-mist flushing. Sandvik says the state-of-the-art control system will bring increased productivity in both tunneling and underground mine pro
June 17, 2016 Read time: 3 mins
The DT912D, for limestone applications
2403 Sandvik Construction is introducing what it says is a completely new tunneling jumbo, the DT912D, especially for limestone applications.

The DT912D - a high reach, single boom jumbo - is completely self-contained. It is powered with a fuel-efficient and environmentally friendly Tier 4 Final diesel engine and equipped with onboard compressor and water tank for air-mist flushing.

Sandvik says the state-of-the-art control system will bring increased productivity in both tunneling and underground mine production.

The 24tonne jumbo is designed for fast and accurate drifting and production drilling of cross sections between 12-125m². It features a 25kW high-frequency RD525 rock drill and what Sandvik says is the most powerful engine ever installed on a diesel-hydraulic jumbo, the Cummins Tier 4 Final with 205kW.

As a standard, the jumbo has an electric controlled drilling system with added automatic functions, including one-hole automatics. There is an SB150 universal boom for large, optimally shaped coverage and full automatic parallelism. In addition to face drilling, the versatile boom can also be used for crosscutting, bolt-hole drilling and extension drilling.

An efficient 4m³ onboard compressor and an extra-large 1,000litre water tank for air-mist flushing allow the DT912D to operate independently from the tunnel or mine infrastructure and guarantee longer drilling period from one set up.

The DT912D offers rapid, safe and balanced tramming thanks to its powerful, four-wheel-drive centre articulated carrier.

Also, the ergonomic FOPS/ROPS-complied cabin keeps the noise level under 73dB (A) at all times. As an option the cabin is also available with a lifting system allowing even better visibility for tramming and drilling. This all makes the new jumbo an enjoyable workplace for the operator.

Sandvik offers several instrumentation packages from which customers can choose. The silver package is for drilling angles and depth monitoring, while the gold package offers semi-automatic drilling according to drill plan. The platinum package - the most comprehensive - has automatic boom movements and drilling cycle.

The gold and platinum packages are integrated with the Sandvik iSURE tunnel management tool for accurate drilling, charging and blasting plans. In addition, the iSURE provides useful data collection and analysis reports for improving the work cycle and process and can also be complemented with the new geoSURE rock mass analysis and visualisation system.

For more information on companies in this article

Related Content

  • Asphalt paving review for 2019
    February 12, 2020
    A series of new asphalt pavers have been introduced in 2019
  • Sandvik DC125R is new member of DC hammer drill family
    February 13, 2013
    Sandvik DC125R is a new member to the proven Sandvik DC family of compact, rubber-tyred top hammer drill rigs. The fully remote-controlled, hydraulic and self-propelled mini-sized drilling unit on a four-wheel drive carrier, is for drilling 22–45mm holes, and replaces the former Sandvik DC122R, one in the series of rigs originally launched in 1988 under the product name of Tamrock Commando. “A range of job site tests show that the new model offers better manoeuvrability than ever before. This is thanks to t
  • Sandvik carries out drill and blast seminar in Russia
    July 29, 2015
    Boosting quarrying efficiency by improving drilling and blasting operations. Drilling and blasting operations are crucial for quarry efficiency and Sandvik recently held a Russian Quarry seminar focussing on this in a bid to boost effectiveness for a number of key clients. Sandvik Construction Russia worked with official distributor Quarry-Service to run the Quarry Seminar, this year located in Yekaterinburg. The event concentrated on drilling and blasting and featured the expertise and knowledge of Arne L
  • Dowel bar drilling selection poses challenges
    January 11, 2013
    Pneumatic concrete dowel drills have one purpose – to drill holes. While their intended use is easy to recognize, operation of this equipment isn’t quite so simple. In fact, it’s a bit of a science. That’s not to say they’re difficult to operate. But there are certain best practices and processes to keep in mind for proper drill operation, whether it’s an on-grade, slab-rider or equipment-mounted model. Operators who adopt these guidelines and implement them on every job are rewarded with better performance