Skip to main content

Sandvik’s new DT912D jumbo offers intelligent drilling efficiency

Sandvik Construction is introducing what it says is a completely new tunneling jumbo, the DT912D, especially for limestone applications. The DT912D - a high reach, single boom jumbo - is completely self-contained. It is powered with a fuel-efficient and environmentally friendly Tier 4 Final diesel engine and equipped with onboard compressor and water tank for air-mist flushing. Sandvik says the state-of-the-art control system will bring increased productivity in both tunneling and underground mine pro
June 17, 2016 Read time: 3 mins
The DT912D, for limestone applications
2403 Sandvik Construction is introducing what it says is a completely new tunneling jumbo, the DT912D, especially for limestone applications.

The DT912D - a high reach, single boom jumbo - is completely self-contained. It is powered with a fuel-efficient and environmentally friendly Tier 4 Final diesel engine and equipped with onboard compressor and water tank for air-mist flushing.

Sandvik says the state-of-the-art control system will bring increased productivity in both tunneling and underground mine production.

The 24tonne jumbo is designed for fast and accurate drifting and production drilling of cross sections between 12-125m². It features a 25kW high-frequency RD525 rock drill and what Sandvik says is the most powerful engine ever installed on a diesel-hydraulic jumbo, the Cummins Tier 4 Final with 205kW.

As a standard, the jumbo has an electric controlled drilling system with added automatic functions, including one-hole automatics. There is an SB150 universal boom for large, optimally shaped coverage and full automatic parallelism. In addition to face drilling, the versatile boom can also be used for crosscutting, bolt-hole drilling and extension drilling.

An efficient 4m³ onboard compressor and an extra-large 1,000litre water tank for air-mist flushing allow the DT912D to operate independently from the tunnel or mine infrastructure and guarantee longer drilling period from one set up.

The DT912D offers rapid, safe and balanced tramming thanks to its powerful, four-wheel-drive centre articulated carrier.

Also, the ergonomic FOPS/ROPS-complied cabin keeps the noise level under 73dB (A) at all times. As an option the cabin is also available with a lifting system allowing even better visibility for tramming and drilling. This all makes the new jumbo an enjoyable workplace for the operator.

Sandvik offers several instrumentation packages from which customers can choose. The silver package is for drilling angles and depth monitoring, while the gold package offers semi-automatic drilling according to drill plan. The platinum package - the most comprehensive - has automatic boom movements and drilling cycle.

The gold and platinum packages are integrated with the Sandvik iSURE tunnel management tool for accurate drilling, charging and blasting plans. In addition, the iSURE provides useful data collection and analysis reports for improving the work cycle and process and can also be complemented with the new geoSURE rock mass analysis and visualisation system.

For more information on companies in this article

Related Content

  • Sophisticated tunnelling option
    July 20, 2012
    Sandvik is rolling out a range of sophisticated tunnelling jumbo drilling rigs, equipped with advanced automation features. The new DTi models feature wide coverage and powerful HX5T drifters that enable them to carry out large and small and tunnelling jobs. To optimise operation, the four machines can use Sandvik's latest iSURE software, which allows blasting operations to be designed on a PC and then downloaded onto the rigs using conventional USB memory sticks: this allows full automation of the face dri
  • Sandvik on drill at the Liantang/Heung Yuen Wai Boundary project
    April 4, 2018
    The Liantang/Heung Yuen Wai Boundary Control Point project is creating a seventh land crossing, including highways and tunnels, between Shenzhen in China and Hong Kong There are already two control points on the eastern side of the New Territories between China and Hong Kong - at Man Kam To and Sha Tau Kok – to access eastern Shenzhen and Guangdong. All cross-boundary traffic travelling from these points must use busy local roads in Hong Kong and Shenzhen before joining the major highway systems. The US
  • Sandvik’s Turkish delight at groundbreaking tunnel vision
    May 20, 2014
    Turkey’s longest, and what will be the world’s fourth longest, highway tunnel is being built under Mount Ovit in the northeast of the country. Sandvik Construction is playing a vital role in the construction of the giant new structure, which will enable all-year-round access to what is a relatively remote and often snow-blocked part of Anatolia Having had their freedom of movement blighted for many years by wintertime snow blocking the D925 highway, along with narrower roads and passes, at Mount Ovit, resi
  • Drilling efficiency
    February 20, 2012
    The latest developments in drilling rigs can help boost efficiency in quarry producion applications - Mike Woof reports