Skip to main content

Sandvik pits its QA335 Doublescreen against its QA331 split screen

Seeing was believing for Karl-Werner Bierbrauer, owner of an equipment rental outfit in Germany. Sandvik put on a special demonstration for this long-time Sandvik customer to show the advantages of the new QA335 Doublescreen. Bierbrauer started Bierbrauer & Sohn in Kell, western Germany, in 1985. It now occupies larger premises on an industrial estate in Pommerfeld/Kretz. This was initially in the region of 20,000m2 and included a workshop as well as office premises. In 2008 the site was expanded by addi
June 17, 2016 Read time: 3 mins
An on-site comparison of the QA335 Doublescreen and QA331 split screen
Seeing was believing for Karl-Werner Bierbrauer, owner of an equipment rental outfit in Germany. 325 Sandvik put on a special demonstration for this long-time Sandvik customer to show the advantages of the new QA335 Doublescreen.

Bierbrauer started Bierbrauer & Sohn in Kell, western Germany, in 1985. It now occupies larger premises on an industrial estate in Pommerfeld/Kretz. This was initially in the region of 20,000m2 and included a workshop as well as office premises. In 2008 the site was expanded by adding a 30,000m2 recycling plant and an additional 1,000m2 of workshop.

Karl-Werner Bierbrauer has a longstanding relationship with both Sandvik and its dealer for mobile crushers and screens in the area, TTS Trump Technik Service. This was recently shown when it came to upgrading Bierbrauer’s mobile screening plant. At present the business rents construction machinery with the mainstay being Sandvik’s QA331 mobile three-way split screen.

But Falko Greifenberg and Carsten Trump from TTS Trump Technik Service made Bierbrauer aware of the advantages of using a QA335 Doublescreen. A trial was arranged for  the QA331 to go head-to-head against the QA335.

Before the test began it was estimated that the QA335 would be able to deliver 20% more production than the QA331, with improved material separation and sizing through Sandvik’s Doublescreen concept. On average, the QA331 was producing an average of 160tonnes per hour. The QA335 however was able to deliver 270tonnes per hour – 40% more production.

The QA335 has a 4 x 1.5m Doublescreen box of two high-speed screening boxes with independent drive units. With the ability to adjust the working angles on each screen, optimum screen performance and precise material gradings may be achieved.

The QA335 has also proved highly economical to run with low operating costs due to low fuel consumption. A high level of service and maintenance safety is guaranteed by readily available access and hydraulically operated lifting and lowering applications for a quick change of screening media.

The hopper grid may be operated wirelessly from the loader which results in time-saving and uninterrupted operation cycles. The hydraulic conveyors can produce large product stockpiles.

Sandviks says that the standard fitting of the QA335 makes it is ideal for most users’ requirements, but a variety of optional extras are available.

For more information on companies in this article

Related Content

  • Recycling highway material reduces waste and costs
    March 15, 2012
    The use of specialist equipment to produce hydraulically bound mixtures can save 30-40% on the cost of landfill and backfill it is claimed. The transportation and removal of old material from certain highway projects has long been a problem for contractors. But David MacLynn believes that the answer, in many instances, could lie in the use of hydraulically bound mixtures (HBM), which he says can save between 30-40% on the cost of landfill and backfill.
  • Sand, gravel and asphalt, building Poland’s roads
    February 24, 2012
    A new quarry is producing top quality aggregates for Poland's massive road construction programme writes Claire Symes. Wakoz Beton's Glazica sand quarry in Poland is a major source of high quality sand and gravels for the Gdansk construction market. The site is modern and only opened in 2006 but Wakoz Beton has continued to invest in facilities to improve its efficiency and output quality. The installation of a CDE mobile washing plant at the site last year is allowing it to provide materials for concrete.
  • Sandvik on drill at the Liantang/Heung Yuen Wai Boundary project
    April 4, 2018
    The Liantang/Heung Yuen Wai Boundary Control Point project is creating a seventh land crossing, including highways and tunnels, between Shenzhen in China and Hong Kong There are already two control points on the eastern side of the New Territories between China and Hong Kong - at Man Kam To and Sha Tau Kok – to access eastern Shenzhen and Guangdong. All cross-boundary traffic travelling from these points must use busy local roads in Hong Kong and Shenzhen before joining the major highway systems. The US
  • Boosting quarry efficiency by cutting fines
    June 4, 2020
    The Norwegian quarry firm Feiring Bruk reports an 88% reduction in fines following the commissioning of its new wet processing plant. The firm operates primarily in eastern Norway and has 10 sites extracting and producing crushed stone, gravel and asphalt.