Skip to main content

Sandvik invests heavily in its Irish plant in Ballygawley

Sandvik has invested €2.27 million in a new powder coating facility for mobile crushers and screens at its factory in Ballygawley, Northern Ireland. The result is improved edge machine protection for the equipment and increased resistance to corrosion, as well as reducing the factory’s waste emissions. The new facility will enable the mobile crusher and screen manufacturing process to benefit from reduced assembly times using the “Kanban” manufacturing philosophy, as well as producing other operating
January 4, 2016 Read time: 1 min
325 Sandvik has invested €2.27 million in a new powder coating facility for mobile crushers and screens at its factory in Ballygawley, Northern Ireland.

The result is improved edge machine protection for the equipment and increased resistance to corrosion, as well as reducing the factory’s waste emissions.

The new facility will enable the mobile crusher and screen manufacturing process to benefit from reduced assembly times using the “Kanban” manufacturing philosophy, as well as producing other operating synergies.

Automated processes, improved material utilisation, atmosphere protection and cutting out the need for hazardous waste disposal contributes to better environmental standards.

For more information on companies in this article

Related Content

  • Sandvik carries out drill and blast seminar in Russia
    July 29, 2015
    Boosting quarrying efficiency by improving drilling and blasting operations. Drilling and blasting operations are crucial for quarry efficiency and Sandvik recently held a Russian Quarry seminar focussing on this in a bid to boost effectiveness for a number of key clients. Sandvik Construction Russia worked with official distributor Quarry-Service to run the Quarry Seminar, this year located in Yekaterinburg. The event concentrated on drilling and blasting and featured the expertise and knowledge of Arne L
  • Fast flyover removal with specialist demolition equipment
    July 12, 2012
    An overcrowded Indian flyover was removed in record time using specialist demolition equipment, as Patrick Smith reports Demolition of the landmark Lalbaug flyover south of central Mumbai has been completed and work on a new bigger bridge has started in India's largest city. Although the 38-year-old Sant Dnyaneshwar (Lalbaug flyover) two-lane, one-way traffic artery was serviceable and used by to 15,000 vehicles/hour, there were daily traffic jams and environmental consequences. Despite the complex and dema
  • Sandvik boosts crushing performance
    April 15, 2013
    Sandvik has unveiled the Premium QI441 PriSec Impactor mobile crusher and the QE341 mobile scalper, both of which have been designed with improved output, easier operation and increased mobility. The QI441 features Sandvik’s patented PriSec crushing chamber, which is designed for rapid switching between primary and secondary crushing applications. Two hydraulically adjusted curtains permit the production of a wide range of product sizes. Increased discharge heights and conveyor lengths deliver up to 50% mor
  • Advances in milling
    July 23, 2024
    Some major machine manufacturers have introduced improved milling equipment to the market - Mike Woof reports