Skip to main content

Safety covered

Saint-Gobain PAM UK says it has developed the Opt-Emax, a range of one-man operable access covers, in response to health and safety concerns over a perceived increase in accidents occurring from drainage operatives lifting heavy access covers. Through an innovative design, each triangular cover section is independently hinged, said to considerably reduce required effort when lifting compared with traditional access covers. Once opened, the hinge blocks at 900, preventing accidental closure. Paul Thompson, m
December 20, 2012 Read time: 2 mins
5475 Saint-Gobain PAM UK says it has developed the Opt-Emax, a range of one-man operable access covers, in response to health and safety concerns over a perceived increase in accidents occurring from drainage operatives lifting heavy access covers.

Through an innovative design, each triangular cover section is independently hinged, said to considerably reduce required effort when lifting compared with traditional access covers. Once opened, the hinge blocks at 900, preventing accidental closure.

Paul Thompson, marketing manager of municipal castings at Saint-Gobain PAM UK, said: “Our high performance Opt-Emax product provides an assured level of safety for those who need to gain access to below ground services for inspection or maintenance purposes. Our ongoing commitment to delivering assured levels of safety has led to the development of a product that is able to cope with the day-to-day operations that personnel have to undertake, delivering a solution that has the operator at the heart of its design.”

Thompson said Opt-Emax is kitemarked to EN124 and fully compliant with the additional requirements of HA 104/09, SFA and CESWI.

“The product also includes enhanced security benefits, protecting against theft with an innovative locking system,” added Thompson. “Opt-Emax features a ‘master’ cover section that has to be unlocked before the remaining sections will open sequentially. It has also been developed so the entire unit can be protected with just one optional locking kit, which can be fitted retrospectively should additional security or anti-theft capability be required.

Saint-Gobain PAM UK is adding a further three new products to its current Opt-Emax range. The range includes clear opening options extending from 600x450 to 2250x750, plus GripTop anti-skid options for key sizes.

For more information on companies in this article

Related Content

  • Eurocode regulations assure conformity
    February 28, 2012
    A Europe without borders is an attractive prospect for the construction and design industries, claim supporters of Eurocodes. For all companies involved in the construction and infrastructure sectors, Swedish company Trelleborg for example, new Eurocode regulations will have decisive importance. So says Professor Haig Gulvanessian, one of the experts involved in developing the codes, which are a series of 10 European Standards (EN 1990-EN 1999) providing a common approach for the design of buildings and oth
  • Austria's new tunnel meets safety regulations
    July 13, 2012
    New safety regulations and high traffic volumes require new tunnel construction all across Europe. Mike Woof reports Anew highway tunnel now being built in Austria will boost traffic volumes and safety standards on a key European route. The existing Pfänder Tunnel lies close to Austria's borders with Germany and Switzerland and carries a heavy traffic volume, so a new parallel tunnel is under construction to help spread this load, increasing capacity as well as safety. Stringent tunnel safety standards have
  • IRD wins $5 million Oklahoma contract
    April 26, 2012
    International Road Dynamics (IRD) has been awarded a contract by Oklahoma Department of Transportation (ODOT) to build, implement, and maintain new and innovative port-of-entry (POE) electronic (E)-screening systems (EES) and virtual weigh stations (VWS) for commercial vehicles within the State of Oklahoma. The initial phase of the contract includes installations valued at US$5,036,500.00 on Interstate-35 North, Interstate-40 East, and Interstate-40 West. The initial contract period is one year with options
  • Innovative asphalt paver advances for 2015
    April 8, 2015
    Pressure on asphalt paver manufacturers to develop new and more efficient machines is bringing results - Mike Woof writes. For all the key manufacturers in the asphalt paving segment, pressure is being brought to bear with regard to the development of new and more efficient machines. Both for US and European style of pavers, incremental improvements are being seen in machines. In keeping with regulations for Europe and North America, many of the new generation machines are now being powered by the latest lo