Skip to main content

Safety covered

Saint-Gobain PAM UK says it has developed the Opt-Emax, a range of one-man operable access covers, in response to health and safety concerns over a perceived increase in accidents occurring from drainage operatives lifting heavy access covers. Through an innovative design, each triangular cover section is independently hinged, said to considerably reduce required effort when lifting compared with traditional access covers. Once opened, the hinge blocks at 900, preventing accidental closure. Paul Thompson, m
December 20, 2012 Read time: 2 mins
5475 Saint-Gobain PAM UK says it has developed the Opt-Emax, a range of one-man operable access covers, in response to health and safety concerns over a perceived increase in accidents occurring from drainage operatives lifting heavy access covers.

Through an innovative design, each triangular cover section is independently hinged, said to considerably reduce required effort when lifting compared with traditional access covers. Once opened, the hinge blocks at 900, preventing accidental closure.

Paul Thompson, marketing manager of municipal castings at Saint-Gobain PAM UK, said: “Our high performance Opt-Emax product provides an assured level of safety for those who need to gain access to below ground services for inspection or maintenance purposes. Our ongoing commitment to delivering assured levels of safety has led to the development of a product that is able to cope with the day-to-day operations that personnel have to undertake, delivering a solution that has the operator at the heart of its design.”

Thompson said Opt-Emax is kitemarked to EN124 and fully compliant with the additional requirements of HA 104/09, SFA and CESWI.

“The product also includes enhanced security benefits, protecting against theft with an innovative locking system,” added Thompson. “Opt-Emax features a ‘master’ cover section that has to be unlocked before the remaining sections will open sequentially. It has also been developed so the entire unit can be protected with just one optional locking kit, which can be fitted retrospectively should additional security or anti-theft capability be required.

Saint-Gobain PAM UK is adding a further three new products to its current Opt-Emax range. The range includes clear opening options extending from 600x450 to 2250x750, plus GripTop anti-skid options for key sizes.

For more information on companies in this article

Related Content

  • Advanced, low emission, fuel efficient earthmoving
    February 23, 2012
    Manufacturers are rolling out sophisticated machines for the European, North American and Japanese markets - Mike Woof reports. This year has been a pivotal period for the development of advanced, low emission earthmoving machines. During 2011 an array of manufacturers have introduced new models designed to comply with the latest Stage IIIB/Tier 4 Interim emissions regulations introduced for
  • Asphalt compaction finishing
    February 16, 2021
    Volvo CE is now offering a new rubber tyred compactor for finishing work in key emergent markets
  • Fast flyover removal with specialist demolition equipment
    July 12, 2012
    An overcrowded Indian flyover was removed in record time using specialist demolition equipment, as Patrick Smith reports Demolition of the landmark Lalbaug flyover south of central Mumbai has been completed and work on a new bigger bridge has started in India's largest city. Although the 38-year-old Sant Dnyaneshwar (Lalbaug flyover) two-lane, one-way traffic artery was serviceable and used by to 15,000 vehicles/hour, there were daily traffic jams and environmental consequences. Despite the complex and dema
  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.