Skip to main content

Safety covered

Saint-Gobain PAM UK says it has developed the Opt-Emax, a range of one-man operable access covers, in response to health and safety concerns over a perceived increase in accidents occurring from drainage operatives lifting heavy access covers. Through an innovative design, each triangular cover section is independently hinged, said to considerably reduce required effort when lifting compared with traditional access covers. Once opened, the hinge blocks at 900, preventing accidental closure. Paul Thompson, m
December 20, 2012 Read time: 2 mins
5475 Saint-Gobain PAM UK says it has developed the Opt-Emax, a range of one-man operable access covers, in response to health and safety concerns over a perceived increase in accidents occurring from drainage operatives lifting heavy access covers.

Through an innovative design, each triangular cover section is independently hinged, said to considerably reduce required effort when lifting compared with traditional access covers. Once opened, the hinge blocks at 900, preventing accidental closure.

Paul Thompson, marketing manager of municipal castings at Saint-Gobain PAM UK, said: “Our high performance Opt-Emax product provides an assured level of safety for those who need to gain access to below ground services for inspection or maintenance purposes. Our ongoing commitment to delivering assured levels of safety has led to the development of a product that is able to cope with the day-to-day operations that personnel have to undertake, delivering a solution that has the operator at the heart of its design.”

Thompson said Opt-Emax is kitemarked to EN124 and fully compliant with the additional requirements of HA 104/09, SFA and CESWI.

“The product also includes enhanced security benefits, protecting against theft with an innovative locking system,” added Thompson. “Opt-Emax features a ‘master’ cover section that has to be unlocked before the remaining sections will open sequentially. It has also been developed so the entire unit can be protected with just one optional locking kit, which can be fitted retrospectively should additional security or anti-theft capability be required.

Saint-Gobain PAM UK is adding a further three new products to its current Opt-Emax range. The range includes clear opening options extending from 600x450 to 2250x750, plus GripTop anti-skid options for key sizes.

For more information on companies in this article

Related Content

  • Tarmac’s productivity boost with new software
    August 9, 2018
    A highly sophisticated software system is at the heart of a major boost to productivity and efficiency from contractor Tarmac. The firm is utilising the latest logistics software from Germany to improve its performance. The company is the first contractor in the UK to employ the BPO ASPHALT software developed by Volz Consulting in Germany. This advanced planning and real-time software technology can be utilised to optimise road construction logistics and boost productivity. The software allows Tarmac’s co
  • Investing in compaction machine innovation
    March 14, 2012
    The Wirtgen Group is developing its manufacturing facilities outside of Germany. The company has extensive operations in Brazil and China and has now opened a new plant in India, which has started production already. Joint president Stefan Wirtgen said, “The first machine we made was a Hamm compactor. It is specially developed for the Indian market.”
  • Investing in compaction machine innovation
    April 13, 2012
    The Wirtgen Group is developing its manufacturing facilities outside of Germany. The company has extensive operations in Brazil and China and has now opened a new plant in India, which has started production already. Joint president Stefan Wirtgen said, “The first machine we made was a Hamm compactor. It is specially developed for the Indian market.”
  • Upgrading a busy A road link in the UK
    July 4, 2018
    The upgrade to the UK’s busy A14 route will address a significant traffic bottleneck - Mike Woof writes The UK is suffering badly from traffic congestion, a problem that is particularly severe in and around its major cities. Lack of investment in road construction over many years has resulted in a major backlog of work, while the country has seen growing vehicle numbers. To make matters worse, there have been few additions to the major road network since the late 1980s and early 1990s. And the combinatio