Skip to main content

Safety covered

Saint-Gobain PAM UK says it has developed the Opt-Emax, a range of one-man operable access covers, in response to health and safety concerns over a perceived increase in accidents occurring from drainage operatives lifting heavy access covers. Through an innovative design, each triangular cover section is independently hinged, said to considerably reduce required effort when lifting compared with traditional access covers. Once opened, the hinge blocks at 900, preventing accidental closure. Paul Thompson, m
December 20, 2012 Read time: 2 mins
5475 Saint-Gobain PAM UK says it has developed the Opt-Emax, a range of one-man operable access covers, in response to health and safety concerns over a perceived increase in accidents occurring from drainage operatives lifting heavy access covers.

Through an innovative design, each triangular cover section is independently hinged, said to considerably reduce required effort when lifting compared with traditional access covers. Once opened, the hinge blocks at 900, preventing accidental closure.

Paul Thompson, marketing manager of municipal castings at Saint-Gobain PAM UK, said: “Our high performance Opt-Emax product provides an assured level of safety for those who need to gain access to below ground services for inspection or maintenance purposes. Our ongoing commitment to delivering assured levels of safety has led to the development of a product that is able to cope with the day-to-day operations that personnel have to undertake, delivering a solution that has the operator at the heart of its design.”

Thompson said Opt-Emax is kitemarked to EN124 and fully compliant with the additional requirements of HA 104/09, SFA and CESWI.

“The product also includes enhanced security benefits, protecting against theft with an innovative locking system,” added Thompson. “Opt-Emax features a ‘master’ cover section that has to be unlocked before the remaining sections will open sequentially. It has also been developed so the entire unit can be protected with just one optional locking kit, which can be fitted retrospectively should additional security or anti-theft capability be required.

Saint-Gobain PAM UK is adding a further three new products to its current Opt-Emax range. The range includes clear opening options extending from 600x450 to 2250x750, plus GripTop anti-skid options for key sizes.

For more information on companies in this article

Related Content

  • Securing safer transportation infrastructure through non-destructive technology
    June 16, 2014
    Kevin Vine reports on the use of non-destructive testing for structural analysis of bridges Seven years ago, the overpass collapse in Laval, Québec that led to the death of five people brought to light severe issues with the state of the country’s bridges and transportation infrastructure. More recently, a crack in the Champlain Bridge to Montreal that forced over 160,000 commuters to find alternate routes to work reaffirmed a need for greater emphasis on early detection before a crisis occurs.
  • Soilmec’s compact piling rig works in tight spots
    February 2, 2015
    Italian drilling, piling and foundation equipment specialist Soilmec is introducing its compact SM-4 rig designed to create sectional flight auger (SFA) piles, a technique that uses sectional lengths of a hollow stem continuous flight auger. Soilmec says that the new machine is ideal for “job sites with low head room or very restricted (access),” and in situations that “a CFA rig cannot reach.” Once the SM-4 is on site, “each section, commencing with a toothed lead auger, is added to the rig as the auger
  • Soilmec’s compact piling rig works in tight spots
    January 6, 2017
    Italian drilling, piling and foundation equipment specialist Soilmec is introducing its compact SM-4 rig designed to create sectional flight auger (SFA) piles, a technique that uses sectional lengths of a hollow stem continuous flight auger. Soilmec says that the new machine is ideal for “job sites with low head room or very restricted (access),” and in situations that “a CFA rig cannot reach.” Once the SM-4 is on site, “each section, commencing with a toothed lead auger, is added to the rig as the auger
  • Innovative new drainage solutions will help keep roads free from water
    October 2, 2014
    An array of new technologies will help optimise road drainage and minimise flooding risks - Mike Woof reports In the UK the specialist contractor Lanes Group has carried out extensive inspection work of the drainage systems for the M6 toll route around the city of Birmingham. A powerful zoom camera has been used to carry out the inspection work for Midland Expressway, which operates and maintains the 43km-long motorway, running from Coleshill to Cannock.